_

. .

4

,

,

"* N

un:Tso srArts

.7

1

NUCt. EAR REGULATORY COMMISSION

-

f

j

necion i

e

f

$31PAftM AVENUE

.[

MING OF ##USSI A. PENNSYt.V ANG A 19444

5W

Docket No. 50-293

'W/ 0 71937, [2

Boston Edison Company M/C Nuclear

9

"'

ATTN: Mr. A. V. Morisi

(' g'*%,

Nuclear Operations Support Manager

  • =

f

800 Boylston Street

f

Boston, Massachusetts 02199

4

g

u,

Gentlemen:

Subject:

Inspection No. 50-293/81-03

This refers to the routine safety inspection conducted by Mr. J. Johnson and Mr.

W. Sanders of this office on February 2-6, 11-13, 23, and 27, 1981, of activi-

ties authorized by NRC License No. DPR-35 and to the discussions of our findings

held by Mr. Johnson and Mr. Sanders with Mr. Ziemianski and other members of

your staff periodically during the inspection and at the conclusion of the

inspection.

Areas examined during this inspection are described in the Office of Inspecticn

and Enforcement Inspecticn Peport which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, intervtews with personnel, and observations by the

inspector.

Within the scope of this inspection, no items of noncomplianca were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspec-

tion report will be placed in the NRC's Public Document Room.

If this report

contains any infomation that you (or your contractor) believe to be proprietary,

it is necessary that you make a written application within 20 days to this

office to withhold such infomation from public disclosure. Any such applica-

tion must be accomnanted by an affidavit executed by the owner of the information,

which identifies the document or part sought to be withheld, and which contains

a statement of reasons which addresses with specificity (b) (4) of Section 2.79C,

the items which will be

considered by the Conmission as listed in subparagraph

The infomation sought to be withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you in this

regard within the specified period, the report will be placed in the Public

Document Room.

.

8105140 &

g

.

',

.

10 EI

Boston Edisen Company M/C Nuclear

2

No reply to this letter is required; however if you have any questions cen-

cerning this inspection, we will be pleased to discuss them with you.

Sincerely,

o

kh

'

El rhl. Brunner, Chief

Pr4jects Branch No.1,

Division of Resident and

Project Inspection

Enclosure: Office of Inspection and Enforcement Inspection

Report Numoer 50-293/81-03

cc w/ encl:

R. D. Machon, Nuclear Operations Manager - Pilgrim Station

bec w/ encl:

IE Mail 1 Files (For Appropriate Distribution)

Central Files

Public Cocument Recm (PCR) (LPOR)

Lccal Public Doe: ment Room

fluclear Safety Infomation Centsr (MSIC)

Technical Infomation Center (TIC)

REG:I Reading Ro m

Connonwealth of Massachusetts (2)

!!RC Resident Inspec*ar

Chief, Emergency Preparedness and Program Support Branch (w/o encl)

i

__