ML19347E124

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-295/81-01 & 50-304/81-01 on 810101-0227 & Notice of Violation
ML19347E124
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 03/16/1981
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML19347E125 List:
References
NUDOCS 8104240061
Download: ML19347E124 (2)


See also: IR 05000295/1981001

Text

g(2 l4

'

~

'o

UNITED STATES

,

L

["

NUCLEAR REGULATORY COMMISSION

p

,

g

REGION lit

wo

g

e

799 ROOSEVELT ROAD

T'g

GLEN ELLYN, ILLINOIS 50137

e

March 16, 1981

C

9;

Docket 'fo. 50-295

C

Docket No. 50-304

Commonwealth Edison Company

9

4pg80

ATTN:

Mr. Cordell Reed

e,g

-

Vice President

/A "2

-

Post Office Box 767

b

-

Chicago, IL 60690

f

Gentlemen:

  1. #co

r'

o

This refers to the inspection conducted by Messrs. J. E. Kohler and

J. R. Waters of this office on January I through February 27, 1981,

of activities at the Zion Power Generating Station authorized by NRC

Operating Licenses No. DPR-39 and No. DPR-48 and to the discussion of

our findings with Mr. K. L. Graesser at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during thr inspection. Within these areas, the inspection consisted

of a selective examination of procedures and representative records,

observations, and interviews with personnel.

During this inspection, certain of your activities appeared to b.e in

noncompliance with NRC requirements, as described in the enclosed

Appendix A, and a written response is required.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter,

the enclosures, and your response to this letter will be placed in

the NRC's Public Document Room, except as follows.

If the encicsures

contain information that you or your contractors believe to be proprietary,

you must apply in writing to this office, within twenty-five days of the

date of this letter, to withhold such information from public disclosure.

The application must include a full statement of the reasons for which the

information is considered proprietary, and should be prepared so that

proprietary information identified in the application is contained in an

enclosure to the application.

.

O

.

8104scO@

.

_.

._.

-. _

_

_-- .

.

.

.

.

Commenwealth Edison Company

-2-

March 16, 1981

3

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

,

R. F. seishman, Acting Director

Division of Resident and Project

Inspection

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Reports

No. 50-295/81-01 and

No. 50-304/81-01

cc w/encls:

J. S. Abel, Director

of Nuclear Licensing

K. Graesser, Station

Superintendent

Central Files

Reproduction Unit NRC 20b

AE0D

Resident Inspector, RIII

PDR

Local PDR

NSIC

TIC

Dean sansell, Office of

Assistant Attorney General

.

-

.

.L

gpso

saybs

sy

aan

v

- _

- _ _

. _ _ .

- ._ _

.

..

.

.

. . . .

.