Notice of Violation from Insp on 810101-0227
ML19347E127
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 03/16/1981
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19347E125 List:
References
50-304-81-01, 50-304-81-1, NUDOCS 8104240067
Download: ML19347E127 (1)


Text

.

LJ Appendix A NOTICE OF VIOLATION Commonwealth Edison Company Docket No. 50-304 As a result of the inspection conducted on January 1,1981 to February 27, 1981, and in accordance with the Interim Enforcement Policy, 45 FR 66754 (October 7,1980), the following violation was identified:

Technical Specification 6.2.A states in part that detailed written procedures shall be prepared, approved and adhered to...

Contrary to the above, Zion Administrative Procedure 10-52-2, Operating Log Books, was violated on February 12, 1981 when nuclear station operator and shif t engireer log books did not include an entry regarding significant reactor e solant system leakage that was occurring on Zion Unit 2.

(See paragraph 4).

This is a Severity Level V Violation.

Pursuant to the provisions of 10 CFR 2.201, you are required to submit to this of fice within twenty-five days of the date of this Notice a written statement or explanation in reply, including f or each item of noncompliance; (1) corrective action taken and the results achieved; (2) corrective action to be taken to avoid further concompliance; and (3) the date when full com-pliance will be achieved. Under the authority of Section 182 of the Atomic Energy Act of 1954, as amended, this response shall be submitted under oath or affirmation.

CD Nl J:: f!

dated W

l w-R. F. Heishman, Acting Chief Division of Resident &

Project Inspection O

3104 240 ()d \\