- [0 V Consumers E
l power 4
4 Company N
j
General offices: 212 West Michigen Avenue, Jackson, MI 49201 + (517) 788-0550 March 23, 1981 Q
t\\
c.
. g[g 9 fr 7
7.
g Director, Nuclear Reactor Regulation
[o fo'g 2
Att Mr Dennis M Crutchfield, Chief 63 p
- g #'
40 Operating Reactors Branch No 5 US Nuclear Regulatory Commission Washington, DC 20555 i
DOCKET 50-155 - LICENSE DPR BIG ROCK POINT PLANT - DESCRIPTION OF INSERVICE TEST (IST) PROGRAM FDR PUMPS AND VALVES AND REQUESTS FOR RELIEF FROM SPECIFIC ASME CODE REQUIRDIENTS -
PROGRAM REVISION Consumers Power Company submittals dated December 7,1979 and August ih,1980 provided the initial IST Program and a revision to that Program, respectively.
NRC letter dated January 27, 1981 indicated that the NRC has reviewed our submittals and found that Category E valves were not included.
Consumers Power Company recognized this situation and concluded that it did not adversely affect safety because the affected valves were already administrative 1y controlled by system check-off lists.
In response to the request of NRC letter dated January 27, 1981, we are revis-ing the IST Program to include Category E valves. The changes (3 pages) attached to this letter comprise a revision to the two submittals referenced above.
The changes involve the addition of " locked open" and " locked closed" nomenclature to the legend (page 11) and the addition of new table portions including the Category E valves (new pages 16a and 16b).
Your review of the attachments and the program as revised and approval of the identified relief requests are requested.
David P Hoffhan (Signed)
David P Hoffhan Nuclear Licensing Administrator CC JGKeppler, USNRC NRC Resident Inspector Attachment (3 pages )
83032604go
11 Rev 3/23/81 LEGEND FOR IWV TESTING CHARTS Valve Type Actuator Type Normal Position
)
BF - Butterfly AO - Air Operator ALT - Alternating BL - Ball EXP - Explosive C - Closed CK - Check FL - Flow D - Disabled EXP - Explosive MO - Motor Operator 0 - Open GL - Globe PR - P mssure LO - Locked Open GT - Gate SO - Solenoid Operator LC - Locked Closed RV - Relief Testing Requimments CLHR - Check leakage during NSSS Hydrostatic Testing perfor=ed each reactor atautdown for refueling DER - Disassemble and inspect each reactor shutdown for refueling.
ECS - Exercise valve each reactor cold shutdown
- But not more frequently than Quarterly ES - Exercise valve each reactor shutdown
- But not more frequently than Quarterly LRR - Leak rate test during each reactor shutdown for refueling Exercise once per three conths (Quarterly)
Q Exercise / check setting during each reactor shutdown for refueling RR SRP - Each shutdown in which both recirculation pumps are secured or at most each reactor shutdown for refueling 1/RR - One per each reactor shutdown for refueling 2/RR - Two per each reactor shutdown for refueling 2/20 - 204 of valves in two years
- Per Big Rcck Point Technical Specification Definition Systems CRD - Control Rod Drive CS - Core Spray RES - Reactor Depressurization System Other Definitions
-N - No Y - Yes
- In stroke time column, means to be-detemined by testing program - The strcke time limit is not established now.
a IWV TESTING d
3*
8 S
3 6
as e
a m
R R
R R
8 3
m Si Y
E d
Remarks 0
p$
h 94 gm m
d a
y (Not to be used for relief basis) 4 Valve O
O e4 h
Category Valve Print Number Number o
A B
C D
E to u
a m
a VFP-5 M-123 G-15 X
8" GT LO B-8 N
Elect. Fire Pump Discharge VFP-6 M-123 F-15 X
8" GT LO B-8 N
Diesel Fire Pump Discharge VFP-13 M-123 11 - 1 7 X
8" GT LO B-8 N
Sply. to Underground Fire !!dr.
VFP-lh M-123 11 - 2 0 X
6" GT LO B-8 H
Isol. Vlv. in Fire IIeader VFP-15 M-123 G-19 X
6" GT LO B-8 N
Fire Sys. to Turbine Bldg (East)
VFP-16 M-123 B-21 X
6" GT LO B-8 N
Isol. V1v. In Fire IIeader VFP-17 M-123 B-24 X
6" GT Lo B-8 N
Isol. V1v. in Fire IIeader VFP-18 M-123 C-21 X
6" GT LO B-8 N
Fi re Sy s. to Turbine Pldg. (So.)
VFP-19 M-123 11 - 2 0 X
6" GT LO B-8 N
Isol. Vlv. in Fire IIeader VFP-29 M-123 0-5 x
6" GT LO Both N
Sply. V1v. to CS Sparger VFP-30 M-123 N-6 X
h" GT LO Both N
Sply. Vlv. to Redun. Core Spray N
Fi re Sys. Isol. in Turbine Bldg. (Go.)
VFP-3h M-123 C-21 X
6" GT LO B-8 VFP-35 M-123 G-19 X
6" BF LO B-8 N
Fi re Sys. Div. Vlv. in Turbine Bldg.
(East)
" NOTE: These class "E" valves are inspected during the perfonnance of Valve Checkoff List A 8 and B-8.
No additional testing is required.
N.:
N l3
%K
~.
l
IWV TESTING 3
0 0
E O
f E
Remarks S4 S
U U
E E
(Not to be used e
U
.E Y
Um h
S h
for relief basis) o N
E f
S f5 N
u e
M Valve d
0 4
4*
[
f
" "E U Valve Print Number Number o
A B
C D
E u2 M
E1 54 E4 VPI-1 M-123 R-10 X
6" GT LO Both N
Suction Strainer Hdr. Outlet VPI-2 M-123 H-11 X
6" Gr LO Both N
Suction Strainer lidr. Outlet VPI-3 M-123 R-15 x
8" GT Lo Both N
Inlet to CS Pumps 1"
GT LO Both N
Ex Discharge, Core Spray VPI 14 M-123 0-16 X
4 VPI-6 M-123 P-12 X
2" GT LO Both N
Inlet to CS Test Tank (T !41 )
4 1"
GT LO Both N
Inlet to CS Test Tank (T lal4)
VPI-7 M-123 P-12 X
4 1"
GT ID Both N
Encl. Spray Inlet From CS Hx VPI-8 M-123 P-32 X
4 VPI-9 M-123 P-13 X
8" GT LO Both N
Outlet CS Test Tank (T 1414 )
5
' NOTE: 'Ihese class "E" Valves are inspected during the per-formance of Valve Checkoff List A-8 and B-8.
No additional testing is requi red.
g w
O L"!?