ML19347C597
| ML19347C597 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 12/02/1980 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parker W DUKE POWER CO. |
| Shared Package | |
| ML19347C596 | List: |
| References | |
| NUDOCS 8012310295 | |
| Download: ML19347C597 (2) | |
See also: IR 05000413/1980034
Text
__
.
'
- pn ug
g%
UNITED STATES
(
[
NUCLEAR REGULATORY COMMISSION
,
g
REGION 11
g
2[f
101 MARIETTA sT., N.W., SUITE 3100
o,
ATLANTA, GEORGIA 303o3
DEC - 21980
In Reply Refer To:
RII:EHG
50-413/80-34
50-414/80-34
Duke Power Company
ATTN:
W. O. Parker, Jr.
Vice President, Steam Production
P. O. Box 2178
i
Charlotte, NC 28242
Gentlemen:
This refers to the inspection conducted by E. H. Girard of this office on November 5-7,
i
1980 of activities authorized by NRC Construction Permit Nos. CPPR-116 and
l
CPPR-117 for the Catawba facility, and to the discussion of our findings held
with D. G. Beam at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
l
Within the scope of this inspection, no items of noncompliance were disclosed.
i
'
We have examined actions you have taken with regard to previously identified
enforcement matters. These are discussed in the enclosed inspection report.
(
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
l
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
!
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
!
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
,
!
that proprietary information identified in the application is contained in a
i
separate part of the document. If we do not hear from you in this regard within
l
the specified period, the report will be placed in the Public Document Room.
l
l
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
/
Charles E. M rp
, Chief
801281':Li g '
Reactor Construction & Engineering
Support Branch
Enclosure:
(See Page 2)
. _ _ -
_ - . .
_ _ _ _ _
. - -
_.
.
. - . .
.
'
>
Duke Power Company
-2-
Enclosure:
Inspection Report Nos.
50-413/80-34 and 50-414/80-34
cc w/ encl:
J. W. Hampton, Station Manager
D. G. Beam, Project Manager
.
.