ML19347C597

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-413/80-34 & 50-414/80-34 on 801105-07.No Noncompliance Noted
ML19347C597
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 12/02/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19347C596 List:
References
NUDOCS 8012310295
Download: ML19347C597 (2)


See also: IR 05000413/1980034

Text

__

.

'

  • pn ug

g%

UNITED STATES

(

[

NUCLEAR REGULATORY COMMISSION

,

g

REGION 11

g

2[f

101 MARIETTA sT., N.W., SUITE 3100

o,

ATLANTA, GEORGIA 303o3

DEC - 21980

In Reply Refer To:

RII:EHG

50-413/80-34

50-414/80-34

Duke Power Company

ATTN:

W. O. Parker, Jr.

Vice President, Steam Production

P. O. Box 2178

i

Charlotte, NC 28242

Gentlemen:

This refers to the inspection conducted by E. H. Girard of this office on November 5-7,

i

1980 of activities authorized by NRC Construction Permit Nos. CPPR-116 and

l

CPPR-117 for the Catawba facility, and to the discussion of our findings held

with D. G. Beam at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

l

Within the scope of this inspection, no items of noncompliance were disclosed.

i

'

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

(

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

l

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

!

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

!

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

,

!

that proprietary information identified in the application is contained in a

i

separate part of the document. If we do not hear from you in this regard within

l

the specified period, the report will be placed in the Public Document Room.

l

l

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

/

Charles E. M rp

, Chief

801281':Li g '

Reactor Construction & Engineering

Support Branch

Enclosure:

(See Page 2)

. _ _ -

_ - . .

_ _ _ _ _

. - -

_.

.

. - . .

.

'

>

Duke Power Company

-2-

Enclosure:

Inspection Report Nos.

50-413/80-34 and 50-414/80-34

cc w/ encl:

J. W. Hampton, Station Manager

D. G. Beam, Project Manager

.

.