Forwards IE Insp Rept 50-461/80-16 on 800701-31 & Notice of Violation
ML19347B260
Person / Time
Site: Clinton 
Issue date: 08/28/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gerstner W
ILLINOIS POWER CO.
Shared Package
ML17198A112 List:
References
NUDOCS 8010140150
Download: ML19347B260 (2)


See also: IR 05000461/1980016

Text

i

IlQ

  • M

,f

o q'o.

UNITE D STATES

u

,

-

8 ' ,, ,

3

NUCLEAR REGULATORY COMMISSION

l

$

- E

REGION lli

'"

o,

f

799 ROOSEVELT ROAD

l *

l

[

GLEN ELLYN, ILLINOIS 60137

    • .+

,

l

IAU6 2 81980J

e

Docket No. 50-461

Illinois Power Company

I

ATTN:

Mr. W. C. Gerstner

!

Executive Vice President

500 South 27th Street

Decatur, IL 62525

Gentlemen:

This refers to the inspection conducted by Mr. H. H. Livermore of this

office on July 1-31, 1980, of activities at the Clinton Power Station,

j

Unit 1, authorized by NRC Construction Permit No. CPPR-137 and to the

'

discussion of our findings with Messrs. A. Budnick, J. Hampton, and

others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted

l

l

of a selective examination of procedures and representative records,

!

observations, and interviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with hTC requirements, as described in the enclosed Appendix A.

This notice is sent to you pursuant to the provisions of Section 2.201

of the NRC's " Rules of Practice," Pert 2, Title 10, Code of Federal

Regulations.

Section 2.201 requires you to submit to this office

,

'

within thirty days of your receipt of this notice a written statement

,

or explanation in reply, including for each item of noncompliance:

(1) corrective action taken and the results achieved; (2) corrective

!

action to be taken to avoid further noncompliance; and (3) the date

when full compliance will be achieved.

j

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter,

the enclosures, and your response to this letter will be placed in the

NRC's Public Document Room, except as follows.

If the enclosures contain

information that you or your contractors believe to be proprietary, you

must apply in writing to this office, within twenty days of your receipt

of this letter, to withhold such information from public disclosure.

The application must include a full statement of the reasons for which

the information is considered proprietary, and should be prepared so

that proprietary information identified in the application is contained

,

j

in an enclosure to the application.

,

8010140 e50

.

-

,

-

.

.

hD6 2 8 lg3g'

Illinois Power Company

-2-

We will gladly discuss any questions you have concerning this

,

inspection.

Sincerely,

d <._

Av

-

G. Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Report

No. 50-461/80-16

cc w/encls:

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Mr. Dean Hansell, Of fice of

Assistant Attorney General

Mr. Gary N. Wrig'.it, Chief

Division of Nuclear Safety