05000346/LER-1980-067-03, /03L-0:on 800829,while in Mode 5,main Steam Isolation Bypass Valve MS101A Failed.Caused by Failed Solenoid Valve Operator SV101-1.Solenoid Replaced

From kanterella
(Redirected from ML19347B095)
Jump to navigation Jump to search
/03L-0:on 800829,while in Mode 5,main Steam Isolation Bypass Valve MS101A Failed.Caused by Failed Solenoid Valve Operator SV101-1.Solenoid Replaced
ML19347B095
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/26/1980
From: Isley T
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19347B094 List:
References
LER-80-067-03L, LER-80-67-3L, NUDOCS 8010010513
Download: ML19347B095 (2)


LER-1980-067, /03L-0:on 800829,while in Mode 5,main Steam Isolation Bypass Valve MS101A Failed.Caused by Failed Solenoid Valve Operator SV101-1.Solenoid Replaced
Event date:
Report date:
3461980067R03 - NRC Website

text

U.S. NUCLEAR REGULAT2RY COMMISSION N1tC FoRW 366 (7 77)

LICENSEE EVENT REPORT CONTROL BLOCK: 'l l

l l

l lh (PLEASE PRINT OR TYPE ALL REQUIRED INFoRMATION) 6 l 0 l H l D l B l S l 1l@l 0 l 0 l O l 0 l 0 l 0 l 0 l 0 l 0 l 0 l 0 l@l 4 l 1 l 1 l 1 l 11@

l l@

7 8 9 LICENSEE CODE 14 15 LICENSE NvMsER 26 26 LICENSE TYPE J0 b7 CAT b8 E

$" "C l L l@l 0l 5 l 0 l - l 0 l 3 l 4 l 6 'Qj 0 l 8 l 2 l 9 l 8 l 0 l@l0 l9 l2 l 618 l0 l@

CON'T 7

8 60 61 OOCKET NUMBER 68 63 EVENT DATE 74 75 REPORT OATE 80 EVENT DESCRIPTION AND PROB ABLE CONSEQUENCES h l (NP-33-80-80) On 8/29/80 at 1530 hours0.0177 days <br />0.425 hours <br />0.00253 weeks <br />5.82165e-4 months <br />, operations personnel experienced a failure of l a 2 f5 TT1 l the Main Steam Isolation Bypass Valve MS101A. The bypass valve is normally closed l

l and was f ailed in the closed position.

The valve was declared inoperable.

Being in l 0 4 I O l s) l Mode 5, the station did not enter the action statement of T.S. 3.7.1.5.

There was l

The valve was l Q E l no danger to the health and safety of the public or station personnel.

l failed in its safety actuated position, Closed. This is being reported to document a j 0 7 l

iO Ie I l component failure.

80 E

CODE S BC E COMPONENT CODE SUSCOdE SU E

Q lC lD l@ W@ l A l@ l Vl Al Ll Vl 0l Pl@ {@ ]@

7 9

10 ft 12 33 18 19 20 SEQUENTIAL OCCURRENCE

~iPORT REVISION h gt,Pg l288l0l b

l 0l 6l 7l y

l Ol 3l lL[

g lh.l LE R /RO EVENT YEAR REPORT NO.

CODE TYPE N

22 23 24 26 27 28 29 30 31 32 TAK N ACT f*L NT

  • T HOURS S B IT D F OF 8.

SUPPLI MAN I TURER

(,J_j@ W @

lZl@

d@

l0l0l0l0l (Y_j @

lYl@

l A l@

lA l4 l2 l8 l@

33 J4 34 36 31 40 48 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h y l The cause of the failed bypass valve was its failed solenoid valve operator SV101-1.

l lilijl Further checking showed that the burned coil in the solenoid was AC and was in a DC l

TTTT'l I circuit. Although functional, this use of an AC coil in a DC circuit reduces l

l the life of the coil.

Under Facility Change Request 80-214, the failed solenoid was i

, 3 l

j 4 l l replaced with a qualified DC solenoid valve.

l 80 7

8 9 STA S

% POWER OTHIR ST ATUS ISCO Y

DISCOVERY DESCRIPTION

(_!ljh l 0 l 0 l 0 l@l NA l

l C l@l Safety Features Actuation System Reset Vhrif, 1 5 8

CO0 RENT ACTivlTY LOCATION OF RELE ASE RELE ASED OF RELE ASE AMOUNT OF ACTIVITY l

l NA l

l NA t 6 PERSONNEL E EPOS ES NUUsE R TYPE

DESCRIPTION

101010 l@l2 l@l NA I

i i IES PERSoNNEttNJU DESCniPriONh NUUst R l

1010lol@l NA i a 80 f

8 9 11 12 LOSS OF OR OAMAGE TO FACILITY TYPE DESCRIPitON l

(_i_ll.][Z__}@lNA 80 3

8 9 to e

8 (N hlNA h y 10 0 t nKG i

i i i iiiiiiiiil3 ISSUE DE CRtPTION 68 69 80 %

7 44 9 10 om Isley PHONE:

'00-149

- rynetF OF Pf1EPARER

~

b TOLEDO EDISON COMPANY DAVIS-BESSE NUCLEAR POWER STATION UNIT ONE SUPPLEMENTAL INFORMATION FOR LER NP-33-80-80 DATE OF EVENT: August 29, 1980 FACILITY: Davis-Besse Unit 1 IDENTIFICATION OF OCCURRENCE:

Failure of Main Steam Isolation Bypass Valve MS101-A Conditions Prior to Occurrence: The unit was in Mode 5 with Power (MWT) = 0 and Load (Gross MWE) = 0.

Description of Occurrence: On August 29, 1980 at 1530 hours0.0177 days <br />0.425 hours <br />0.00253 weeks <br />5.82165e-4 months <br />, operations personnel were attempting to stroke MS101A in preparation for some special test verification and found it would not operate. This valve is the bypass around the main steam line isolation valve MS101. The bypass is normally closed and was failed in the closed position. The valve was declared inoperable. Being in Mode 5, the station did not enter the action statement of Technical Specification as 7.1.5.

This technical speci-fication requires the main steam isolation valves to be operable in Modes 1, 2, and 3.

This finding is being reported to document a component failure.

Designation of Apparent Cause of Occurrence: The cause of the failed bypass valve was its f ailed scienoid control valve SV101-1. The coil in the solenoid had burned It was noted that this was an AC coil installed in a DC circuit. The result up.

bef e, that even though this arrangement will work, such application significantly re-daces the life of the coil. A check of the instrument records showed that the solenoid valve as installed was per the architect / engineer's specifications.

It appears tri-error came in specifying the coil number for the valve.

Analysis of Occurrence: There was no danger to the health and safety of the public or to station personnel. The valve fails in its safety position, closed.

Corrective Action

Under Facility Change Request (FCR)80-214, the AC solenoid valve was replaced with a qualificu DC solenoid valve. At 1525 hours0.0177 days <br />0.424 hours <br />0.00252 weeks <br />5.802625e-4 months <br /> on August 30, 1.980, MSI-1-A was successfully stroked and the valve declared operable. The similar valve MS100-A although still operable was alsu found to have an AC coil installed in its solenoid control valve.

It was also replaced under the same FCR.

Failure Data: No previous reports of valve operator failures due to design error.

LER #80-067