MONTHYEARML19036A9022019-02-0505 February 2019 Acceptance of Amendment Request Revising Emergency Action Level Schemes Project stage: Acceptance Review ML19249B7792019-08-29029 August 2019 Independent Spent Fuel Storage Installation (Isfsi); North Anna, Units 1 and 2 and ISFSI; and Surry, Units 1 and 2 and ISFSI - License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Rev. 6. Project stage: Request ML19309E5232019-10-30030 October 2019 Supplemental Response to Request for Additional Information to License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Rev. 6 Project stage: Request ML19346B3892019-11-12012 November 2019 NRR E-mail Capture - Planned Issuance of Millstone, North Anna, and Surry Power Stations and Associated Isfsis. License Amendment to Adopt Emergency Action Level Schemes Project stage: Approval ML19305D2482019-12-31031 December 2019 Issuance of Amendments Adoption of Emergency Action Level Schemes Per NEI 99-01, Rev. 6 Project stage: Approval 2019-12-31
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24032A4702024-02-0101 February 2024 Change in Estimated Review Schedule Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC ML24024A0202024-01-24024 January 2024 Correction to Safety Evaluation Associated Wit Amendment No. 288 - Revision to Applicability Term for RCS Heat-Up and Cooldown Pressure-Temperature Limitations Figures ML24024A2452024-01-24024 January 2024 1/24/2024 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in SE for Amendment No. 288 - Revision to Applicability Term for RCS Heatup and Cooldown Pressure-Temperature Limitations Figures ML23320A1122024-01-18018 January 2024 NRC to Fws, Concurrence with Endangered Species Act Determinations for North Anna Power Station, Units 1 and 2, Subsequent License Renewal, Issuance of Draft Supplemental Environmental Impact Statement, and Opportunity for Public Comment ML23355A2722023-12-21021 December 2023 NRR E-mail Capture - Schedule Revision for Emergency Preparedness Staff Augmentation Times License Amendment Request ML23326A0132023-11-22022 November 2023 Acceptance Review Determination LAR to Support Implementation of Framatome Gaia Fuel ML23318A0952023-11-14014 November 2023 Request for Additional Information (E-mail Dated 11/14/2023) LAR to Revise TSs Related to Framatome Gaia Fuel ML23318A1172023-11-13013 November 2023 NRR E-mail Capture - Formal Issuance of RAIs for North Anna Technical Support Center (TSC) License Amendment Request (LAR) (L-2023-LLA-0006) ML23317A0732023-11-13013 November 2023 Acceptance Review Determination - License Amendment Request Modification of TS SR 4.3.6.a ML23312A2962023-11-0808 November 2023 Email - Surry Relief Request Acceptance Review Results; Surry Unit 1 and 2 IST P-3 P-4 Pumps ML23312A2022023-11-0808 November 2023 Relief Request Acceptance Review Results; IST Impracticality P-1 P-2 RHR Containment Pumps ML23297A2312023-10-24024 October 2023 E-mail to File - Summary of September 13, 2023, Meeting with Dominion to Discuss Proposed LAR to Support Cycle Reloads Using Framatome Gaia Fuel ML23283A3262023-10-10010 October 2023 Update Acceptance Review Status Surry TS Change Apply RG 1.97, Rev 3 Instrumentation to Lhsi ML23265A2302023-09-22022 September 2023 Acceptance Review Determination - License Amendment Request Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC ML23257A2092023-09-14014 September 2023 NRR E-mail Capture - Formal Issuance of 2nd Round RAIs for Surry Units 1&2 and North Anna Units 1&2 Emergency Plans LAR ML23255A2772023-09-12012 September 2023 Acceptance of Requested Licensing Action: Surry TS Change, Lhsi Indication and Instrumentation ML23243A9862023-08-31031 August 2023 NRR E-mail Capture - Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166) ML23258A0552023-08-31031 August 2023 Setup of Online Reference Portal and Audit Plan for the NRC Staff'S Review of LAR to Use Framatome Small Break and Realistic Large Break LOCA Methodologies (08/31/2023 e-mail) ML23219A1602023-08-0707 August 2023 003 Radiation Safety Baseline Inspection Information Request ML23199A2832023-07-18018 July 2023 Request for Additional Information (E-mail Dated 7/18/2023) LAR to Revise the Pressure-Temperature Limits ML23193A9552023-07-12012 July 2023 NRR E-mail Capture - Acceptance Review for VC Summer and Surry Relief Request (L-2023-LLR-0029) ML23187A1122023-07-0606 July 2023 TSC Relocation LAR RAIs ML23172A0752023-06-21021 June 2023 Acceptance Review Determination LAR to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and COLR Related to Framatome Gaia Fuel ML23171B0522023-06-20020 June 2023 NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted) ML23145A0052023-05-25025 May 2023 Acceptance Review Determination Exemption to Use Framatome Gaia Fuel Assemblies Containing Fuel Rods Fabricated with M5 Fuel Rod Cladding ML23145A0042023-05-25025 May 2023 Acceptance Review Determination LAR to Use Framatome Small Break and Realistic Large Break LOCA Methodologies ML23115A3022023-04-24024 April 2023 4/24/2023 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in Issuance of Amendments Adoption of TSTF-359, Increase Flexibility in Mode Restraints ML23107A2212023-04-10010 April 2023 Amendment Turbine Building Wind Load Basis Reclassification License Amendment Request - State Consultation No Comment ML23089A1882023-03-29029 March 2023 Request for Additional Information (E-mail Dated 3/29/2023) Spring 2022 Steam Generator Tube Inspection Report ML23075A0232023-03-15015 March 2023 NRR E-mail Capture - RAI - License Amend Req (LAR) to Revise Tech Spec (Ts) 3.6.8 Limiting Condition for Operation to Remove Refueling Water Chemical Addition Tank and Replace the Containment Sump Buffer North Anna, 1 and 2 (L-2022-LLA-0162 ML23068A0242023-03-0808 March 2023 RAI Issuance Fuel Handling Trolley LAR ML23067A2162023-03-0707 March 2023 NRR E-mail Capture - RAI for North Anna, 1 & 2, Surry 1 & 2, Millstone, 2 & 3, Request for Approval of App. F Fleet Report DOM-NAF-2-P, Qual of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion VIPRE-D Computer Code ML23060A0932023-03-0101 March 2023 NRR E-mail Capture - Formal Issuance of RAIs for Surry/North Anna Emergency Plans LAR ML23059A2282023-02-28028 February 2023 NRR E-mail Capture - Draft RAIs for Containment Buffer Change to Natb (L-2022-LLA-0162) ML23054A2412023-02-23023 February 2023 NRR E-mail Capture - Formal Issuance of RAIs for Surry Turbine Building Tornado Reclassification ML23039A1712023-02-0808 February 2023 NRR E-mail Capture - Acceptance Review for Technical Support Center (TSC) Relocation (L-2023-LLA-0006) ML23038A0152023-02-0707 February 2023 Acceptance Review Determination LAR to Revise the Applicability Term for RCS Heatup and Cooldown Pressure-Temperature Limitations Figures ML23024A1522023-01-24024 January 2023 Acceptance Review Determination LAR to Supplement Burnup Credit of Criticality Safety Analysis ML23018A1642023-01-17017 January 2023 Formal Issuance of RAIs for Surry ISI Alternative for SG Welds, 30 Day Calendar Response Period (Email) ML23018A0352023-01-17017 January 2023 NRR E-mail Capture - Acceptance Review for Fleet Report Re Appendix F of DOM-NAF-2-P (L-2022-LLT-0003) ML22354A0352022-12-19019 December 2022 Acceptance Email TSC Relocations LAR ML22349A2102022-12-15015 December 2022 Formal 43-day Request for Additional Information Issuance for Surry Turbine Building License Amendment Request ML23058A1442022-12-0909 December 2022 Record of Surry Verbal Relief Request Authorization - V-01 Mechanical Agitation Vavle 1-SI-241 ML22342B1472022-12-0808 December 2022 NRR E-mail Capture - Acceptance Review for LAR Re NAPS Post LOCA Buffer Change (L-2022-LLA-0162) ML22342A1002022-12-0707 December 2022 Relief Request Acceptance Review Results; Surry ISI Alternative, Prz and SG Welds and Nozzles ML22335A4842022-12-0101 December 2022 NRR E-mail Capture - Acceptance Review for LAR North Anna Power Station - Units 1 and 2 and Surry Power Station - Units 1 and 2 Emergency Plan Staff Augmentation Times (L-2022-LLA-0166) ML22320A5752022-11-16016 November 2022 E-mail to File - Summary of October 18, 2022, Meeting with Dominion to Discuss Requested Actions for Implementing Framatome Gaia Fuel ML22298A2052022-10-25025 October 2022 Acceptance Review Determination for Alternative Request for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles 2024-02-01
[Table view] |
Text
From: Guzman, Richard Sent: Tuesday, November 12, 2019 4:06 PM To: Miller, Ed
Subject:
FW: RE: Planned Issuance of Millstone, North Anna, and Surry Power Stations and associated ISFSIs. License Amendment to Adopt Emergency Action Level Schemes (EPID L-2019-LLA-0003)
Ed - see comment from Jeff Semancik, CT state contact (DEEP - The Connecticut Department of Energy and Environmental Protection). I assume you will check w/the technical staff to develop a short response which will be included in the final SE. Once youve developed an appropriate reply, I can forward it to him. Hes aware that projected issuance of the amendment is end of Dec 2019.
Rich
~~~~~~~~~~~~
Rich Guzman Sr. PM, Division Operator Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Office: O-9C7 l Phone: (301) 415-1030 Richard.Guzman@nrc.gov From: Semancik, Jeffrey <Jeffrey.Semancik@ct.gov>
Sent: Tuesday, November 12, 2019 2:37 PM To: Guzman, Richard <Richard.Guzman@nrc.gov>
Cc: Tifft, Doug <Doug.Tifft@nrc.gov>
Subject:
[External_Sender] RE: Planned Issuance of Millstone, North Anna, and Surry Power Stations and associated ISFSIs. License Amendment to Adopt Emergency Action Level Schemes (EPID L-2019-LLA-0003)
- Richard, I only received the basis document disk from Dominion today. However, based upon my previous review I do have one substantive comment:
- DEEP notes that the proposed thresholds for EAL MPS2 MU 4.2 reflect primary and secondary coolant activity values from TS 3.4.8 which Dominion has identified are non-conservative due to errors in their analyses. Specifically, Dominion has identified that based on their analysis of the radiological consequences following a postulated Main Steam Line Break and Steam Generator Tube Rupture accident, a reduction in the TS primary and secondary coolant specific activity limits are required to meet control room dose regulatory limits. Dominion has implemented administrative limits and has requested a license amendment from the NRC (Serial 19-243 dated July 30, 2019). Since the proposed uses the existing non-conservative values, it appears that Dominion would not classify the UE when they have exceeded their compensatory administrative limits
for 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> even though this condition is a precursor to a more significant event and represents a potential degradation of the level of safety of the plant. DEEP believes that the EAL should reflect the proper values or other compensatory action be taken to ensure proper classification and ORO notification for this condition.
V/R, Jeffrey Semancik Director, Radiation Division Bureau of Air Management Connecticut Department of Energy and Environmental Protection 79 Elm Street, Hartford, CT 06106-5127 P: 860.424.4190F: 860.706.5339 E: jeffrey.semancik@ct.gov www.ct.gov/deep/radiation Conserving, improving and protecting our natural resources and environment; Ensuring a clean, affordable, reliable, and sustainable energy supply.
From: Guzman, Richard <Richard.Guzman@nrc.gov>
Sent: Wednesday, November 6, 2019 10:05 AM To: Semancik, Jeffrey <Jeffrey.Semancik@ct.gov>
Subject:
Planned Issuance of Millstone, North Anna, and Surry Power Stations and associated ISFSIs.
License Amendment to Adopt Emergency Action Level Schemes (EPID L-2019-LLA-0003)
- Jeff, The NRC staff is preparing to issue the following license amendment related to Millstone Power Station, Units 1, 2, and 3, North Anna Power Station, Units 1 and 2, and the Surry Power Station, Units 1 and 2, and their associated independent spent fuel storage installations. A brief description of the license amendment request (LAR) is provided below. Additional information can be found in the licensees submittal which is also referenced below by ADAMS Accession number.
Please let me know if you have any comments or questions regarding this licensing action by November
- 13. The NRCs current projection for issuance of the amendment is by December 31, 2019.
VIRGINIA ELECTRIC AND POWER COMPANY DOMINION ENERGY NUCLEAR CONNECTICUT, INC.
MILLSTONE POWER STATION UNITS 1, 2 AND 3 AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI), NORTH ANNA POWER STATION UNITS 1 AND 2 AND ISFSI, SURRY POWER STATION UNITS 1 AND 2 AND ISFSI, LICENSE AMENDMENT REQUEST TO ADOPT EMERGENCY ACTION LEVEL (EAL} SCHEMES PURSUANT TO NEI 99-01, REV. 6 (EPID L-2019-LLA-0003)
Application date:
January 4, 2019, as supplemented by letters dated August 29, 2019, and October 30, 2019 (ADAMS Accession Nos. ML19011A237, ML19249B779, and ML19309E523, respectively).
Brief Description of LAR:
The amendments would authorize changes to the Millstone Power Station (MPS), North Anna Power Station (NAPS), and Surry Power Station (SPS) emergency plans to incorporate new Emergency Action Level (EAL) schemes prepared using the guidelines of Nuclear Energy Institute 99-01, Revision 6, Methodology for the Development of Emergency Action Levels for Non-Passive Reactors, November 2012.
FR Publish Date:
The LAR was published in the Federal Register (FR) on May 21, 2019 (84 FR 23079) https://www.govinfo.gov/content/pkg/FR-2019-05-21/pdf/2019-10315.pdf. To date, no comments have been received.
- Thanks,
~~~~~~~~~~~~
Rich Guzman Sr. PM, Division Operator Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Office: O-9C7 l Phone: (301) 415-1030 Richard.Guzman@nrc.gov
Hearing Identifier: NRR_DRMA Email Number: 341 Mail Envelope Properties (BN7PR09MB2692AECF5507E6765FC13F4A96770)
Subject:
FW: RE: Planned Issuance of Millstone, North Anna, and Surry Power Stations and associated ISFSIs. License Amendment to Adopt Emergency Action Level Schemes (EPID L-2019-LLA-0003)
Sent Date: 11/12/2019 4:05:52 PM Received Date: 11/12/2019 4:05:53 PM From: Guzman, Richard Created By: Richard.Guzman@nrc.gov Recipients: