ML19345H492

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-508/81-06 & 50-509/81-06 on 810323-27.No Noncompliance Noted
ML19345H492
Person / Time
Site: Satsop
Issue date: 04/17/1981
From: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Leddick R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML19345H493 List:
References
NUDOCS 8105200419
Download: ML19345H492 (2)


See also: IR 05000508/1981006

Text

T/C,

-. e y$

.

<?

UNITED STATES

(f

NUCLEAR REGULATORY COMMISSION

g

. #

y

REGION V

ys*

$

g

1990 N. CALIFORNIA BOULEVARD

gy

% * ,O, , * ,e

SUITE 202, WALNUT CREEK PLAZA

j

WALNUT CREEK, CALIFURNIA 94596

N

y

April 17,1981

M

g\\9

r

E 6 %s #C32

9

9.*

^

Docket Nos. 50-508, 50-509

M

gp.i

%

Washington Public Power Supply System

P. O. Box 1223

Elma, Washington 98541

Attention:

R. S. Leddick

Program Director, WNP-3/5

-

Gentlemen:

Subject: NRC Inspection at Washington Nuclear Projects Nos. 3 and 5 (WNP-3/5)

This refers to the inspection conducted by Messrs. D. P. Haist, G. Hernandez

and A. J. D' Angelo of this office on March 23-27, 1981 of activities authorized

by NRC Construction Permit Nos. CPPR-154 and CPPR-155, and to the discussion

!

of our findings with you and other members of your staff at the conclusion

of the inspection.

Areas examined during this inspection are described in the enclosed inspection

report. Within these areas, the inspection consisted of selective examinations

of procedures and representative records, interviews with personnel, and

observations by the inspector.

No items of noncompliance with NRC requirements were identified within the

scope of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you believe to be proprietary, it is

necessary that you submit a written application to this office, within 20

days of the date of this letter, requesting that such information be withheld

.

from public disclosure. The application must include a full statement of

the reasons why it is claimed that the information is proprietary. The application

should be prepared so that any proprietary information identified is contained

in an enclosure to the application, since the application without the enclosure

will also be placed in the Public Document Room.

If we do not hear from

you in this regard within the specified period, the report will be placed

in the Public Document Room.

1

l

l

8'"2"9M

-- -

.

_

._.

-

_

-

.

-

-

.

.

Washington Public Prxer Supply System

-2-

April 17,1981

Should you have any questions concerning this inspection, we will be glad

to discuss them with you.

Sincerely,

IW

&b=

B. H. aulkenbMief

Reactor ConstNction Projects

anch

Enclosure:

IE Inspection Report

Nos. 50-508/81-06

50-509/81-06

cc w/o enclosure:

R. L. Ferguson, Managing Director, WPPSS

M. E. Witherspoon, WPPSS

D. E. Dobson, WPPSS

(

-

l