Forwards IE Insp Repts 50-508/81-04 & 50-509/81-04 on 810202-27.No Noncompliance Noted
ML19345H172
Person / Time
Site: Satsop
Issue date: 03/24/1981
From: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Dobson D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML19345H173 List:
References
NUDOCS 8105010155
Download: ML19345H172 (2)


See also: IR 05000508/1981004

Text

II

8

%

UNITED STATES

l

8

%

NUCLEAR REGULATORY COMMISSION

O

O/ /

~ y,

i

REGION V

'

g

j

o

1990 N. CALIFORNIA BOULEVARD

  • ,,,*[g

SulTE 202, WALNUT CREEK PLAZA

[

d

WALNUT CREEK, CALIFORNIA 94596

N

g

h

1 m

&[E

March 24, 1981

gi

9

%

b

A&'

W lpy\\

o

/

Docket Nos. 50-508

50-509

Washington Public Power Supply System

P. O. Box 1223

Elma, Washington 98541

Attention: Mr. D. E. Dobson

Acting Program Director

Gentlemen:

Subject:

NRC Inspection at Washington Nuclear Projects

Nos. 3 and 5 (WNP-3/5)

This refers to the inspection conducted by Mr. T. W. Bishop of this

office from February 2-27, 1981, of activities authorized by NRC

Construction Permits Nos. CPPR-154 and -155, and to the discussion

.

of our findings held by Mr. Bishop with you and members of your staff

at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records,

interviews with personnel, and observations by the inspector.

No new items of noncompliance with NRC requirements were identified

within the scope of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter

and the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you

believe to be proprietary, it is necessary that you submit a written

app. :ation to this office, within 20 days of the date of this letter,

requesting that such information be withheld from public disclosure.

The application must include a full statement of the reasons why it

is claimed that the information is proprietary. The application

should be prepared so that any proprietary information identified

is contained in an enclosure to the application, since the application

without the enclosure will also be placed in the Public Document Room.

If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

810502ol55,

9

- . = _ _ _ . _

_

.

.-

--

_ _ -

- . .

'

.

.

Mr. D. E. Dobson

-2-

BAR 241981

Should you have any questions concerning this inspection, we will

be glad to discuss them with you.

i

Sincerely,

l

)

aul

B. H. Faulkenberry

Reactor Constructi

rojects Branch

Enclosure:

IE Inspection Report

Nos. 50-508/81-04

50-509/81-04