Text
'
50277-801227
/
50277-801229
/3 V
~ APPENDIX A NOTICE OF VIOLATION Philadelphia Electric Company Docket No. 50-277 Peach Bottom Unit 2 License No. DPR-44 As a result of the inspection conducted on December 1-31, 1980, and in accord-ance with the Interim Enforcement Policy, 45 FR 66754 (October 7,~1980), the following violations were identified:
A.
Technical Specification 6.13, "High Radiation Area," states in part, "Each High Radiation Area in which the intensity of radiation is greater than 100.
mrem /hr but less than 1000 mrem /hr shall be barricaded and conspicuously j '
posted as a_High Radiation Area and entrance thereto shall be controlled by j
issuance-of a Radiation Work Permit. Any individual or group of individuals
+-
permitted to enter such areas shall be provided with or accompanied by one or more of the following:
1.
A radiation monitoring device which continuously
_ l; indicates the radiation dose rate in the area...".
j.
r Contrary to the above, on. December 27,- 1980,-two individuals were observed -
r working at the north Scram Discharge Volume header,: a high radiation area,x without having a radiation monitoring device which indicates dose rate.'-
{
=
i This is a Severity level IV Violation (Supplement IV) applicable to DPR-44.
~
B.
Technical. Specification 3.6. A.1 states, "The average rate of reactor coolant-4 temperature change during normal.heatup or cool down shall not exceed 100 F-increase (or decrease) in any one hour period."
?
17 '
Contrary to the above, during normal cool down, between.4:30 p.m. and 5:30 p.m. on December 29, 1980,. reactor. coolant tempe-ature, as indicated by the-l F7-C
'B' recirculation loop temperature recorder; decreased 102 F.
This is a Severity Level IV Violation (Supplement I) applicable to DPR-44.
Pursuant to the provisions of 10 CFR 2.201', Philadelphia Electric Company is hereby required to submit to this office'within twenty-five days of the'date of a
this Notice, a written statement or-explanation'in reply, including: :(1) the.
t t-corrective steps which have been taken and the results achieved; (2) corrective
{
neps which will be taken to avoid further violations; and (3) the date when i
full compliance will be achieved..Under the authority of Section 182 of the l
Atomic Energy Act of 1954,-as amended, this response shall be submitted under L
i cath or affirmation.
i o
l i
1.
Dated Elden/J.'Brunner, Chief React'or Operations and Nuclear i
Support Branch 8104300021