Notice of Violation from Insp on 801201-31
ML19345H016
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 03/05/1981
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19345H013 List:
References
50-277-80-35, NUDOCS 8104300021
Download: ML19345H016 (1)


Text

'

50277-801227

/

50277-801229

/3 V

~ APPENDIX A NOTICE OF VIOLATION Philadelphia Electric Company Docket No. 50-277 Peach Bottom Unit 2 License No. DPR-44 As a result of the inspection conducted on December 1-31, 1980, and in accord-ance with the Interim Enforcement Policy, 45 FR 66754 (October 7,~1980), the following violations were identified:

A.

Technical Specification 6.13, "High Radiation Area," states in part, "Each High Radiation Area in which the intensity of radiation is greater than 100.

mrem /hr but less than 1000 mrem /hr shall be barricaded and conspicuously j '

posted as a_High Radiation Area and entrance thereto shall be controlled by j

issuance-of a Radiation Work Permit. Any individual or group of individuals

+-

permitted to enter such areas shall be provided with or accompanied by one or more of the following:

1.

A radiation monitoring device which continuously

_ l; indicates the radiation dose rate in the area...".

j.

r Contrary to the above, on. December 27,- 1980,-two individuals were observed -

r working at the north Scram Discharge Volume header,: a high radiation area,x without having a radiation monitoring device which indicates dose rate.'-

{

=

i This is a Severity level IV Violation (Supplement IV) applicable to DPR-44.

~

B.

Technical. Specification 3.6. A.1 states, "The average rate of reactor coolant-4 temperature change during normal.heatup or cool down shall not exceed 100 F-increase (or decrease) in any one hour period."

?

17 '

Contrary to the above, during normal cool down, between.4:30 p.m. and 5:30 p.m. on December 29, 1980,. reactor. coolant tempe-ature, as indicated by the-l F7-C

'B' recirculation loop temperature recorder; decreased 102 F.

This is a Severity Level IV Violation (Supplement I) applicable to DPR-44.

Pursuant to the provisions of 10 CFR 2.201', Philadelphia Electric Company is hereby required to submit to this office'within twenty-five days of the'date of a

this Notice, a written statement or-explanation'in reply, including: :(1) the.

t t-corrective steps which have been taken and the results achieved; (2) corrective

{

neps which will be taken to avoid further violations; and (3) the date when i

full compliance will be achieved..Under the authority of Section 182 of the l

Atomic Energy Act of 1954,-as amended, this response shall be submitted under L

i cath or affirmation.

i o

l i

1.

Dated Elden/J.'Brunner, Chief React'or Operations and Nuclear i

Support Branch 8104300021