Forwards IE Insp Repts 50-277/80-35 & 50-278/80-28 on 801201-31 & Notice of Violation
ML19345H015
Person / Time
Site: Peach Bottom  
Issue date: 03/05/1981
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML19345H013 List:
References
NUDOCS 8104300018
Download: ML19345H015 (2)


See also: IR 05000277/1980035

Text

J ! * s 9h, n nt:u

'

[

g

UNITED STATES

NUCLEAR REGULATORY COMMISSION

O g} g.

j

REGION I

y

g

631 PARK AVENUE

$s

,o#c

O

KING OF PRUSSIA, PENNSYLVANIA 19406

%***

.

5E

Docket Nos. 50-277

50-278

Philadelphia Electric Company

ATTN: Mr. S. L. Daltroff

Vice President

Electric Production

2301 Market Street

Philadelphia, Pennsylvania 19101

Gentlemen:

Subject:

Combined Inspection 50-277/80-35 and 50-278/80-28

This refers to the routine safety inspection conducted by Mr. Curtis J. Cowgill

of this office on December 1-31, 1980 at Peach Bottom Atomic Power Station Units

2 and 3, Delta, Pennsylvania of activities authorized by NRC License Nos. DPR-44

and DPR-56 and to the discussions of our findings held by Mr. Cowgill with Mr.

W. T. Ullrich of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Based on the results of this inspection, it appears that certain of your activi-

ties were act conducted in full compliance with NRC requirements, as set forth

in the Notice of Violation, enclosed herewith as Appendix A.

These items of

noncompliance have been categorized into the levels described in the Federal

>

Register Notice (45 FR 66754) dated October 7, 1980.

With respect to Item B of Appendix A, our inspector has verified the corrective

action detailed in your event report.

Therefore, your response to this item

need only address measures to prevent recurrence.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Feh ral Regulations, a copy of this letter and the enclosures will

be placed in the NRC's Public Document Room.

If this report contains any infor-

mation that you (or your contractor) believe to be proprietary, it is necessary

that you make a written application within 20 days to this office to withhold

such information from public disclosure. Any such application must be accompanied

by an affidavit executed by the owner of the information, which identifies the

document or part sought to be withheld, and which contains a statement of reasons

which addresses with specificity the items which will be considered by the

Commission as listed in subparagraph (b) (4) of Section 2.790. The information

sought to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within the

specified period, the report will be placed in the Public Document Room.

8104300018

-

-- .

--

'

-

r

..

,

Philadelphia Electric Company

2

MAR 0 51981

'

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

0

= . n_

Eld n

. Brunner, Chief

9

Reactor Operations and Nuclear

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Combined Office of Inspection and Enforcement Inspection

Report Number 50-277/80-35 and 50-278/80-28

cc w/encls:

W. T. Ullrich, Station Superintendent

Troy B. Conner, Jr., Esquire (Without Report)

Eugene J. Bradley, Esquire (Without Report)

Raymond L. Hovis, Esquire (Without Report)

-

Michael J. Scibinico, II, Assistant Attorney General (Without Report)

!

!