ML19345G980

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-321/81-02 & 50-366/81-02 on 810127-30 & Notice of Violation
ML19345G980
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 03/06/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19345G976 List:
References
NUDOCS 8104220952
Download: ML19345G980 (2)


See also: IR 05000321/1981002

Text

)

..

.

' #

$

UNITED STATES

+

['

,

h

NUCLEAR REGULATORY COMMISSION

g(

.t

REGION ll

% . . . . . [f

101 MARIE TTA ST., N.W.. SulTE 3100

o,,

r

/

ATLANTA. GEORGIA 30303

M AR 0 31981

Georgia Power Company

ATTN: J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street

Atlanta, GA 30303

Gentlemen:

Subject: Report Nos. 50-321/81-02 and 50-366/31-02

This refers to the special safety inspection conducted by J. J. Lenahan of this

office on January 27-30, 1981, of activities authorized by NRC Operating License

No. CPR-52 and License No. NPF-5 for the Hatch facilt ty. Our preliminary findings

were discussed with M. Manry at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements.

This item and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A.

Elements to be included in your response are delineated in

Appendix A.

Une new unresolved item is identified in the enclosed inspection report. This

item will be examined durirg subsequent inspections.

In accordance with Section 2.790 of the NRC " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspec-

tion report will be placed in the NRC Public Document Room.

If this report

contains any information that you believe to be proprietary, it is necessary

that you make a written application within 20 days to this office to withhold

such information from public disclosure. Any such applic.nion must include the

basis for claiming that the informati on is proprietary and the proprietary

'

information should be contained in a separate part of the document.

If we do

I

not hear from you in this regard within the specified period, the report will be

i

placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

l

l

Sincere'

,

f

./

/d/ -

'

P . C .m

scting in rEor

Divisionbblesidentand

i

L

Reactor Proje-t Inspection

Enclosures:

(See Pag'e 2)

' ' '

810.4220?5*

i

MAR 0 31981

.-

-

1

J'

Georgia Power Company.

-2-

Enclosures:

1.

Appendix A, Notice of Vioittion

2.

Inspection Report Nos. 50-321/81-02

and 50-366/81-02

cc w/ enc 1:

M. Manry,- Plant Manager

.

C. E.LBelflower, Site QA Supervisor

W. A. Widner, Vice President and

,

General Manager-Nuclear Generation

,