ML19345G980
| ML19345G980 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 03/06/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML19345G976 | List: |
| References | |
| NUDOCS 8104220952 | |
| Download: ML19345G980 (2) | |
See also: IR 05000321/1981002
Text
)
..
.
' #
$
UNITED STATES
+
['
,
h
NUCLEAR REGULATORY COMMISSION
g(
.t
REGION ll
% . . . . . [f
101 MARIE TTA ST., N.W.. SulTE 3100
o,,
r
/
ATLANTA. GEORGIA 30303
M AR 0 31981
Georgia Power Company
ATTN: J. H. Miller, Jr.
Executive Vice President
270 Peachtree Street
Atlanta, GA 30303
Gentlemen:
Subject: Report Nos. 50-321/81-02 and 50-366/31-02
This refers to the special safety inspection conducted by J. J. Lenahan of this
office on January 27-30, 1981, of activities authorized by NRC Operating License
No. CPR-52 and License No. NPF-5 for the Hatch facilt ty. Our preliminary findings
were discussed with M. Manry at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements.
This item and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as
Appendix A.
Elements to be included in your response are delineated in
Appendix A.
Une new unresolved item is identified in the enclosed inspection report. This
item will be examined durirg subsequent inspections.
In accordance with Section 2.790 of the NRC " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspec-
tion report will be placed in the NRC Public Document Room.
If this report
contains any information that you believe to be proprietary, it is necessary
that you make a written application within 20 days to this office to withhold
such information from public disclosure. Any such applic.nion must include the
basis for claiming that the informati on is proprietary and the proprietary
'
information should be contained in a separate part of the document.
If we do
I
not hear from you in this regard within the specified period, the report will be
i
placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
l
l
Sincere'
,
f
./
/d/ -
'
P . C .m
scting in rEor
Divisionbblesidentand
i
L
Reactor Proje-t Inspection
Enclosures:
(See Pag'e 2)
' ' '
810.4220?5*
i
MAR 0 31981
.-
-
1
J'
Georgia Power Company.
-2-
Enclosures:
1.
Appendix A, Notice of Vioittion
2.
Inspection Report Nos. 50-321/81-02
and 50-366/81-02
cc w/ enc 1:
M. Manry,- Plant Manager
.
C. E.LBelflower, Site QA Supervisor
W. A. Widner, Vice President and
,
General Manager-Nuclear Generation
,
1
!
!
4
9
!
.,
t
)
t
i.
I
W
i
e
r
.
s
1
.
,
c
!
I
-
,
-
. .
..
- ..- .-
.
.; . . ..
_
, .
.~.
.
.
...
.
_
.
..
_. .
,
!
i
l