beorgia Power Company 333 Pedrrv i 4 venue Attanta. C eq n 30308 Tttepnone +]4 326-6526
~
' ' ' ', Q p :~.-
.p Maihng Addrese yr Post Offce Box 4545 Atlanta. Georgra 3C302 GeorgiaPower 0l the southern electrc system W. A. Widner Vce Prescent and General Manager Nuclear Generaton March 31, 1981 United States Nuclear Regulatory Commission Office of Inspection and Enforcement Region II, Suite 3100 101 Marietta Street, N.W.
Atlanta, GA 30303
Reference:
Region II: RCL Attention:
Mr. J. P. O'Reilly Inspection Reports 50-321/81-02 50-366/81-02 Gentlemen:
The following information is submitted in response to Inspection Report 81-02, concerning the. inspection by Mr. J. J. Lenahan on January 27-30, 1981.
Violation:
10 CFR 50, Criterion XII, as implemented by Paragraph D.9.12 of the Unit 1 FSAR and Paragraph 17.2.12 of the Unit 2 FSAR, requires, " Measures shall be established to assure that tools, gages, instrumente and other l
measuring and testing devicos used in activities affecting qtelity are properly controlled, calibrated, and adjusted at specified periods to maintain accuracy within necessary limits."
Contrary to the above, no measures have been established for control and l
calibration of the Karol-Warner Model 1000 RP proving ring used in perfor-mance of unconfined compression tests on the K-Krete backfill at the intake structure.
This is a Severity Level ~V Violation.
Admission or denial of the alleged violation:
The violation occurred as stated.
Reasons for the violation:
1 l
The violation occurred because the initial documentation was believed to l
be satisfactory.
Corrective steps which have been taken and results achieved:
1 I
I 810.4220 %
y i
\\vl GeorgiaPower d Mr. J. P. O'Reilly Page two of letter March 31, 1981 A calibration procedure for the proving ring has been written and was approved by the A/E for in<:lusion in the intake structure design change package on March 4, 1981.
t on March 29, 1981, the vendor supplied to Georgia Power (a) a calibra-tion sticker indicating the calibration data for the equipment, date of calibration and name of calibrator and (b) a signed calibration curve.
Corrective steps which will be taken:
Actions taken to date constitute sufficient corrective action. No further actions are necessary.
Date when full compliance will be achieved:
Full cor.pliance was achieve /
.n March 29, 1981.
Please contact this office if further information is desired.
W. A. Widner states that he is Vice President of Georgia Power Company and is authorized to execute this oath on behalf of Georgia Power Company, and that to the best of his knowledge and belief the facts set forth in this letter are true.
Georgia Power Company by:
c'M W. A. Widner Sworn to and subscribed before me this 31st day of March, 1981.
~.,O ' 1/
Netary Public. Georgia, State at Large
" / /(// 6 h y*/)/,/
My CommisWon Expires Sept. 20,1983
~
Notary Public REB:lb I