' [p oc
o
'
'o
UNITED STATES
!}.,q / ,'g
NUCLEAR REGULATORY COMMISSION
7/'
s
REGION il
"
,#
o
101 MARIETT A ST., N.W.. SulTE 3100
'V
ATL ANTA, GEORGI A 30303
- ...*
f * *' ? r 19@f
CD
tb
Duke Power Company
f/
'
('
ATTN:
W. O. Parker, Jr.
9
A g}--
n
Vice President, Stesm Production
"v7 Q 9
U
%
- /Sg
P. O. Box 2178
-
i
ke
p/
Charlotte, NC 28242
gifx
,
f
Gentlemen:
Subject: Report Nos
and M 0/81-0 D
This refers to the routiae safety inspection conducted by T. D. Gibbons of this
office on January 20-23, 1981, of activities authorized by KRC License No. NPF-9
and Construction Permit No. CPPR-84 for the McGuire facility, ano to the discussion
of our findings held with J. C, Rogers at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed i<tspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
perconnel, and observations by the inspectors.
Within the scope of this inspection, no violations or deviations were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters. These are discussed in the enclosed inspection report.
In accordance with Section 2.790 of the NRCs " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) helieve to be proprietary, it is
necessary that you make i written application within 20 days to this office to
withhold such information from public disclosure.
Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary infor-
mation identified in the application is contained in a separate part of the
document. If we de not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
- hh
.
,.
C. E. Murphy, Chi f
Reactor Construction and Engineering
Support Branch
Enclosure:
See Page 2
-810318 0 s ggg
@
._ _ _ _ . _
.
.O
Duke Power Company
-2-
ii.T ~
1981
Enclosure:
Int ~ection Report Nos. 50-369/81-04
ar.J 50-370/81-01
cc w/ encl:
M. D. McIntosh, Plant Manager
J. C. Rogers, Project Manager