ML19345G297
| ML19345G297 | |
| Person / Time | |
|---|---|
| Site: | Satsop |
| Issue date: | 12/12/1980 |
| From: | Spencer G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Mcelwee F WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML19345G298 | List: |
| References | |
| NUDOCS 8103180083 | |
| Download: ML19345G297 (2) | |
See also: IR 05000508/1980013
Text
.'I
.-
-
bO) b( L kk
o
!(g s.,rg[ ,j
o
UNITED STATES
ej
NUCLEAR REGULATORY COMMISSION
-/i
c// .: s
REGION V
1)
E
1990 N. CALIFORNIA BOULEVARD
% * u%# [
SUITE 202. WALNUT CR EEK PLAZA
,*
WALNUT CREEK, CA LIFORNIA 94596
December 12, 1980
6
Docket Nos
$
O
{/{!f Y '
54
"-(b d
Washington Public Pcwer Supply System
NP
M8/A
P. O. Box 968
%%
A.
Richland, Washington 99352
%
7
s
N
l e, ' #
Attention:
F. D. McElwee
WNP-3/5 Program Director
Gentlemen:
Subject: NRC Inspection at Washington Nuclear Pr]jects
Nos. 3 and 5 (WNP-3/5)
This refers to the inspection conducted by Mr. T. W. Bishop of this
office from Septemcer 29 to October 30, 1980 of activities authorized
by NRC Construction Pemits-Nos. CPPR-154 and -155, and to the discussion
of o'ir findings held by Mr. Bishop with Mr. J. C. Lockhart and other
members of your staff at the conclusion of the inspection.
Areas exac..taed during this inspection are described in the enclosed
inspection report. Within these areas, the inspection consisted
of selective examinations of procedures and representative records,
interviews with personnel, and observations by the inspector.
Based on the results of this inspection, it appears that certain
of your activities were not conducted in full compliance with NRC
requirements, as set forth in the Notice of Violation, enclosed
herewith as Apperd t A.
These iten of noncompliance have been
categorized into a level as described in Federal Register Notice
(45 FR66754) dated October 7,1980.
In accordance with Section 2.790 cf the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter
and the enclosed inspection report will be placed in the NRC's Pubif:
Document Room.
If this report contains any information that you
believe to be proprietary, it is necessary that you submit a written
application to this office, within 30 days of the date of this letter,
requesting that such infomation be withheld from public disclosure.
The application must include a full statement of the reasons why
810 31800t3:
-
p
_
.
.
,
2-
Decerter 12, I?30
F. D. McElwee
-
.
it is claimed that the information is proprietary. The application
should be precared so that any proprietary information identified
is contained in an enclosure to the application, since the application
without the enclosure will also be placed in the Public Document
Room.
If we do not hear from you in this regard within the specified
period, ~ the report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will
be glad to discuss them with you.
Sincerely,
, D /.m.~ ,"
G. S. Spencer, Chief
- Reactor Construction and
- Engineering Support- Branch
Enclosures:
- A.
B.
IE. Inspection Report
Nos. 50-508/80-13
50-509/80-13-
cc w/o. Enclosure B:
' M. E. Witherspoon,. Quality Assurance Director
D. E. Dobson, Manager, ';NP 3/S- Projects
.
H
1
.
,
,
i
a
?
l. i..-
ys
. !n