O Washington Public Power Supply System P. O. Box 968 Richland, Washington 99352 Docket Nos. 50-508, 50-509 Construction Permit Nos. CPPR-154, CPPR-155 Apoendix A NOTICE OF VIOLATION As a result of the inspection conducted on September 29 to October 30, 1980, and in accordance with the Interim Enforcement Policy, 45 FR66754 (October 7,-lW0), the following violations were identified:
A.
10 CFR 50, Appendix B, Criterion III, states, in part, that,
" Measures shall be established to assure that applicable regulatory requirements and the design basis...are correctly
'ranslated into... drawings.... "
Paragraph 17.1.3 of the Quality Assurance Program documented in the PSAR states, in part, that, " Prior to submittal of design documents to either WFPSS or Ebasco for review and/or approval, the design contractors, including Ebasco, are responsible for verify;ng that the design meets the requirements of the specifications..."
Contract specification No. 3240-95 (entitled, Structural Steel -
Phase I") specifies that the design 'for structural steel shall be in accordance with project specification No. 3240-448 (entitled
" Structural Steel"). Specification No. 3240-448, paragraph 2.6 states, in part, that, " Field connections shall be friction type joints..." and that connections shal1 ~ be in 'accordance with specification No. 3240-50lWa (sntitled "High Strength Bolted Field Connections for Structural Steel"). Specification
'No. 3240-50lWa, paragraph 6 states, in part, that, " Joints shall be friction-type bolted connections detailed for an allowable working stress in shear of 15,000 psi...."
Contrary to the above, on September 29, 1980, the steel fabricator's design drawings for structural steel beam connections, detailed joint configurations which exceeded the 15,000 psi bolt stress limit of specification 50lWa (Fought drawings Nos.
40,-41, 44, 48, 49, 206,'207, 248, 304, 341, 343, and 350) and
.specified the use of beariag type joints, with accompanying shear stresses of 29,200 to 31,900 psi (Fought drawings Nos.
40,41,and44).
Furthermore, the installing contractor's cuality(program did not address the inspection of bearing type joints i.e...no bolt threads in the shear planes).
This is a Severity Level 4 violation (Supplement II).
810.818 00$
B.
10 CFR 50, Appendix B, Criterion V states, in part, that,
" Activities affecting quality shall be prescribed by documented instructions...and shall be accomplished in accordance with these instructions...."
Paragraph 17.4.5 of the Quality Assurance Program documented in the PSAR states, in part, that, " Provisions are made for assuring that all quality related activities on structures...are performed in accordance with approved instructions...."
Contract specifications Nos. 3240-263, 3240-448, and 3240-50lWa specify that structural steel bolting shall be installed in accordance with instruct ~.cns in the AISC s:ecification for structural < joints usinc ASTM A325 or A490 Bolts-1972 (high strength bolts). This instruction requires. tnat bolting be tightened.
Contrary to the acove, en October 22, 1980, the high strength bolts were loose in the structural joints joining beams 295 B to 293 5 and 219 F/292 E to 39 A at the 362.5 foot elevation in the Unit 5 reactor auxiliary building. These joints had been.inscected and accepted on July 19, 1980 and Septemoer 10, -
1930.
~
This is a Severity Level 5 violation (Supplement II).
Pursuant to~the provisions of 10 CFR 2.201, Washington Public Power Supply System is hereby required to suomit to this office within twenty-five days of 'the date of this Notice, a written statement
. or'explanatien in' reply, including:
(1) the ' corrective steps which have been taken and the results achieved; (2) corrective steps which will be taken to avoid further-itemsiof noncompliance; and (3) the date when full compliance will be achieved. Under;the authority of Section 182 of-the Atemic Energy Act of 1954, as amended, this response shall be subnitted under oath of affirmation.
^
dated-
! 0,'/ 4 / it eh G. S. Spencer' b
, -