Notice of Violation from Insp on 800910-12
ML19345F709
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 10/14/1980
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19345F692 List:
References
50-348-80-26, 50-364-80-37, NUDOCS 8102190089
Download: ML19345F709 (1)


Text

_ _ _ _ _ _ _. _,.

s I

9 APPENDIX A NOTICE OF VIOLA'l 0N L

Alabama Power Company Farley Unit I and 2 License Nos. NPF-2

& CPPR-86 Based on the NRC inspection September 10-12, 1980, certain of your activities were apparently not conducted in full compliance with NRC requirements as indi-cated below. These items have been categorized as described in correspondence to you dated December 31, 1974.

[

5 As required by Criterion V of Appendix B to 10 CFR 50, implemented by Farley FSAR Sections 17.1.5 and 17.2.5, " Activities affecting quality shall be prescribed by documented instructions, procedures, or drawing...and shall be accomplished in accordance with these instructions, procedures, or i

drawings.

Instructions, procedures, or drawings shall include appropriate

]

quantitative or qualitative acceptance criteria for determining that import-ant activities have been satisfactorily accomplished.

t Contrary to the above:

1.

No documented procedures were prepared to prescribe the preparation by j

Daniel Construction of concrete masonry wall as-built drawings.

2.

The Bechtel survey procedure for concrete masonry walls did not contain appropriate criteria for determing that as-built drawings of the masonry walls had been accurately prepared.

i 3.

The Bechtel procedure did not contain appropriate instructions to insure that the accuracy of the masonry wall as-built drawings would be verified I

after all construction in Unit 2 is completed.

l This is an infraction.