ML19345F704
| ML19345F704 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 10/16/1980 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mcdonald R ALABAMA POWER CO. |
| Shared Package | |
| ML19345F692 | List: |
| References | |
| NUDOCS 8102190082 | |
| Download: ML19345F704 (2) | |
See also: IR 05000348/1980026
Text
ga Mc
,\\
UNITED STATES
, ,,
g
p ,7 > j
NUCLEAR REGULATORY COMMISSION
gggy[.s
. a
REGION H
o % 's,.;
f
101 M A RIE TT A ST., N.W., sUtT E 3100
.
i
'\\
f'
ATL ANTA, 'N"mA 30303
(...+j
In Reply Refer To:
RII:JJL
50-348/80-26
50-364/80-37
Alabama Power Company
ATIN:
R. P. Mcdonald
Vice President-Nuclear Ger retion
P. O. Box 2641
Birmingham, AL 35291
antlemen:
This refers to the inspection conducted by J. J. Lenahan of this office on
September 10 through 12, 1980 of activities authorized by NRC License No. NPF-2
and Construction Permit No. CPPR-86 for the Farley facility, and to the discussion
of our findings held with J. Woodard at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Two new unresolved items resulted from this inspection and are discussed it the
enclosed report. These items will be examined during subsequent inspections.
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with NRC requirements. This item and references
to pertinent requirements are listed in the Notice of Violation enclosed herewith
as Appendix A.
This notice is sent to you pursuant to the provisions of Section
2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-
tions.
Section 2.201 requires you to submit to this office, within 20 days of
your receipt of this notice, a written statement or explanation in reply including:
(1) corrective steps which have been taken by you and the results achieved; (2)
corrective steps which will be taken to avoid further noncompliance; and (3) the
date when full cocpliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of thir letter sad the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from pu* 'ic disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary infor-
mation identified in the application is contained in a separate part of the
document.
If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
8102190O R
-- -.-
_ -
-
.
-
- _ . . . . - . _ .
_ - -
.
0CT 161S80
Alabama Power Company
-2_
,
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
-
60?/lt '
C. E. Murphy, Chief
Reactor Construction and Engineering
Support Branch
Enclesures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-34S/80-26
and 50-364/80-37
.
cc w/ encl:
A. R. Barton, Executive Vice President
F. L. Clayton, Jr., Senior Vice President
H. O. Thrash, Manager-Nuclear Generation
O. D. Kingsley, Jr., Manager, Nuclear Engineering
and Technical Services
J. W. McGowan, Manager-Operations
Quality Assurance
W. G. Hairston, III, Plant Manager
W. C. Petty, Manager-Quality Assurance
(Design and Construction)
R. E. Hollands, Jr., QA Supervisor
i
I
l
l
1
l
l
l
l
l
i
l
t.