Forwards IE Insp Repts 50-348/80-22 & 50-364/80-29 on 800701-30 & Notice of Violation
ML19345F650
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 09/11/1980
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML19345F645 List:
References
NUDOCS 8102180789
Download: ML19345F650 (2)


See also: IR 05000348/1980022

Text

ge

! , "' '

i

  1. g

,'o

UNITED STATES

%

~

NUCLEAR REGULATORY COMMISSION

,,

n

,

'

$

"E

REGION ll

, #

.

101 MARIETTA sT

N.W., sulTE 31o0

ATLANTA, GEORGI A 3o303

  • ....

In Reply Refer To:

RII:WHB

50-348/80-22

50-364/80-29

Alabama Power Company

ATTN:

R. P. Mcdonald

Vice President-Nuclear Generation

P. O. Box 2641

Birmingham, AL 35291

Gentlemen:

This refers to the inspection conducted by W. H. Bradford of this office on

July 1 through 31, 1980 of activities authorized by NRC License No. NFP-2 and

.

Construction Permit No. CPPR-86 for the Farley facility, and to the discussion

i

of our findings held with W. G. Hairston at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements. This item and references

to pertinent requirements are listed in the Notice of Violation enclosed herewith

as Appendix A.

This notice is sent to you pursuant to the provisions of Section

2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-

tions. Section 2.201 requires you to submit to this office, within 20 days of

your receipt of this notice, a written statement or explanation in reply including:

(1) corrective steps which have been taken by you and the results achieved; (2)

corrective steps which will be taken to avoid further noncompliance; and (3) the

date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title-

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

l

any information that you (or your contractor) believe to be proprietary, it is

1

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

3102180 %

t

.

.

Alabama Power Company

-2-

the information is proprietary, and should be prepared so that proprietary infor-

mation identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

E. c.

R. C. 6 ewis , Acting Chief

Reactor Operations and Nuclear

Support Branch

Enclosures:

1.

Appendix A, Notice af Violation

2.

Inspection Report Nos. 50-348/80-22

and 50-364/80-29

cc w/ encl:

A. R. Barton, Executive Vice President

F. L. Clayton, Jr., Senior Vice President

H. O. Thrash, Manager-Nuclear Generatien

O. D. Kingsley, Jr. , Manager, Nuclear Engineering

and Technical Services

J. W. McGowan, Manager-Operations

Quality Assurance

W. G. Hairston, III, Plant Manager

W. C. Petty, Manager-Quality Assurance

(Design and Construction)

R. E. Hollands, Jr., QA Supervisor

t