ML19345F647

From kanterella
Jump to navigation Jump to search
Responds to NRC 800911 Ltr Re Violation Noted in IE Insp Repts 50-348/80-22 & 50-364/80-29.Corrective Actions: Written Instructions Given to Operations Personnel Re Initialing & Dating Corrections
ML19345F647
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 10/07/1980
From: Clayton F
ALABAMA POWER CO.
To: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19345F645 List:
References
NUDOCS 8102180773
Download: ML19345F647 (1)


Text

I Al~ bcma Power Company l

600 North 16th Street 'l Post Offica Box 2641 Birminghtm. Atbam3 33291

-s Telephone 205 250-1000

, m F. L CLAYTON, JR.

l Senior Vice President ,

Alabama Power

_!- gI

? me sout*wn eectic s, stem October 7, 1980 J. M. Farley Nuclear Plant NRC Inr.pection of July 1-31, 1980 1

Mr. R. C. Lewis l U. S. Nuclear Regulatory Cot:: mission l Regian II 101 Marietta Street, N.W.

Suite 3.00 Atlanta, Georgia 30303

Dear Mr. Lewis:

RE: RII:WHB 50-348/80-22 50-364/80-29 This letter refers to the apparent deficiency in the subject inspec-tion report which states:

"As required by Section 6.8.1 of Technical Specification, written procedures shall be i=plemented. Administrative Procedure No. 16, Conduct of Operations - Operations Group, Section 6.0, requires that corrected d.ta be initialed and dated.

Contrary to the above, on April 23, 1980 and May 23, 1980, corrected data was inserted in FNP-1-STP-21.1, " Main Steam Line Isolation Valve Operability Test (Partial Closure)". The corrected data had not been initialed and dated."

RESPONSE

Ind.viduals involved in this incident have been counseled on their responsibility in following procedures per AP-16 section 6.0. Also, written instructions have been given to operations personnel regard-ing the initialing and dating of corrections.

- The information contained in this letter is not considered to be of a proprietary nature.

Sincerely y c, F. L. Clayton, Jr.

FLCJr/JRC:bhj 81023yo']J') AMI AL ('MY

-