Forwards IE Insp Rept 70-1113/80-14 on 800722-25 & 0803-19. Notice of Violation Withheld (Ref 10CFR2.790)
ML19345F123
Person / Time
Site: 07001113
Issue date: 10/17/1980
From: Kenna W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Long J
GENERAL ELECTRIC CO.
Shared Package
ML19345F119 List:
References
NUDOCS 8102060761
Download: ML19345F123 (2)


Text

f Id.*.TTE"L TT."MTTF3 PED 7iTH

. {7@

CO: ITEM 2.ES IMORFaTiUN g

o UNITED STATES 8

NUCLEAR REGULATORY COMMISSION 3

n

$ g y,p,.; E L

REGION il 101 MARIETTA sT N.W., SUITE 3100 o, geg\\/

ATLANTA. GEORGIA 30303

  • ...+

In Reply Refer To:

RII:ELC 70-1113/80-14 General Electric Company ATTN:

J. A. Long, General Manager Wilmington Manufacturing Department P. O. Box 780 Wilmington, NC 28402 Gentlemen:

This refers to the inspection conducted by E. L. Clay of this office on July 22-25, 1980 and August 3-19, 1980, of activities authorized by NRC License No. SNM-1097 Wilmington Manufacturing Department and to the discussions of our findin;s at held with J. E. Bergman at the conclusion of the inspection.

Areas examined during this inspection included your program for nuclear material control and accountability under the applicable provisions of Title 10, Code of Federal Regulations, Part 70, "Special Nuclear Material", and specific license conditions. Within these areas, the inspection consisted of selective examina-tions of procedures and representative records, interviews with personnel, performance tests, and observations by the inspectors.

During the inspection, it was found that certain activities under your license appear to be in noncompliance with NRC requirements. This item and references to pertinent requirements are listed in the Notice of Violation enclosed herewith as Appendix A.

This notice is sent to you pursuant to the provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to. this office, within 20 days of your receipt of this notice, a written statement or explanation in reply including:

(1) corrective steps which have been taken by you and the results achieved; (2) corrective steps which will be taken to avoid further noncompliance; and.

(3) the date when full compliance will be achieved.

Details of activities involving safeguards and security measures are exempt from disclosure in accor-dance with 10 CFR 2.790(d). Therefore, your response should be incorporated in a separate paper and referenced in your reply.

In accordance with Section 2.790sd) of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, activities involving safeguards and security measures are exempt from public disclosure; therefore, the enclosures to this letter with the exception of the report cover page, which is an inspection summary, will not be placed in the Public Document Room.

EATER!ALTPJJSCTTED HEREVIITH 8102060fQ ;

CONTAHiS 2.700 IUDRYATION

tunia. Tv :r mro mraa OCT 171880 l

00 iiAl!: 2.75:1 t;;gi;; igg General Electric Company Should you have any questions concerning this letter, we will be glad to discuss the:n with you.

Sincerely, 5 [c[k

. B. Kenna, Chief

' Safeguards Branch

Enclosures:

1.

Appendix A, Notice of Violation (Exempt from Disclosure) 2.

Inspection Report No. 70-1113/80-14 (Exempt from Disclosure) 3.

Inspection Summary (Not Exempt) cc w/ encl:

A. L. Kaplan, Manager Licensing and Compliance Audits C. M. Vaughan, Manager Nuclear Materials Management M!TTRIR Ti"GEiTTED liERE#1Til CG:lTA!;is 2.750 idFORfMT10N