05000339/LER-1980-088-03, /03L-0:on 801127,containment Pressure Channel III Failed High.Caused by Defective Card in Circuit.Circuit Card Replaced & Channel III Restored to Operation

From kanterella
(Redirected from ML19345D680)
Jump to navigation Jump to search
/03L-0:on 801127,containment Pressure Channel III Failed High.Caused by Defective Card in Circuit.Circuit Card Replaced & Channel III Restored to Operation
ML19345D680
Person / Time
Site: North Anna 
Issue date: 12/10/1980
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19345D677 List:
References
LER-80-088-03L-01, LER-80-88-3L-1, NUDOCS 8012160467
Download: ML19345D680 (2)


LER-1980-088, /03L-0:on 801127,containment Pressure Channel III Failed High.Caused by Defective Card in Circuit.Circuit Card Replaced & Channel III Restored to Operation
Event date:
Report date:
3391980088R03 - NRC Website

text

_ - _ _

_ _ _ _ _ =.

U.S. NUCLEAR REGULATORY COMMISSION LICENSEE EVENT REPORT CONTROL BLOCK / / / / / / / (i)

(PLEASE PRLNT OR TYPE ALL REQUIRED INFORMATION)

/0/1/

/V/A/N/A/S/2/ (2)

/0/0/-/0/0/0/0/0/-/0/0/ (3)

/4/1/1/1/1 (4)

/ / / (5)

/0/1/ O LICENSEE CODE LICENSE NUMBER LICENSE TYPE CAT 121O8

/ / 7 7 f 7of (9)

/L/ (6)

/0/5/0/0/0/3/3/9/

(7)

/1/1/2/7/8/0/

(8)

E DOCKET NL'MBER EVENT DATE REPORT DATE j

EVENT DESCRIPTION AND PROBABLE CONSEQUENCES (10) i

/0/2/

/

On November 27, 1980 while operating in Mode 1 at 28% power, the containment

/

/0/3/

/

pressure channel III failed high. Since the operator placed channel III in the/

/0/6/

/

trip mode within one hour, and there were three more pressure channels avail- /

/0/5/

/

able, the health and safety of the public were not affected. The applicable

/

l

/0/6/

/

T.S. is 3.3.2.1, and the event is reportable pursuant to T.S. 6.9.1.9.a.

/

i

/0/7/,

/

/

/0/8/

/

/

SYSTEM

CAUSE

CAUSE COMP.

VALVE CODE CODE SUBCODE COMPONENT CODE SUBCODE SUBCODE

/0/9/

/S/D/ (11) /EL (12) [G[ (13) /I/N/S/T/R/U/ (14) /C/ (15)

/_Z/ (16)

Z SEQUENTIAL OCCURRENCE REPORT REVISION LER/R0 EVENT YEAR 1EPORT NO.

CODE TYPE NO.

(17) REPORT NUMBER

/8/0/

/-/ /0/8/8/

/\\/

/0/3/

/L/

/-/

/0/

ACTION FUTURE EFFECT SHUTDOWN ATTACHMENT NPRD-4 PRIME COMP. COMP 0hTNT TAKEN ACTION ON PLANT METHOD HOURS SUBMITTED FORM SUB. SUPPLIER MANUFACTURER

/M (18) LZ[ (19) /Z// (20) /Z/ (21) /0/0/0/0/ (22) g/ (23) /N/ (24) /N/ (25) /W/1/2/0/(26) j CAUSE DESCRIPTION AND CORRECTIVE ACTIONS (27)

I

/1/0/

/

The pressure channel failed high because of a defective card in the circuit.

/

/1/1/

/

The corrective action was to replace the appropriate circuit card and restore /

/1/2/

/

channel III to an operable status.

/

/1/3/

/

/

/1/4/

/

/

i FACILITY METHOD OF l

STATUS

  • /. POWER OTHER STATUS DISCOVERY DISCOVERY DESCRIPTION (32) l

/1/5/

[C[ (28)

/0/2/8/ (29) /

NA

/ (30) /B/ (31) /

Operator Observation

/

ACTIVITY CONTENT RELEASED OF RELEASE AMOUNT OF ACTIVITY (35)

LOCATION OF RELEASE (36)

/1/6/

[ZL (33)

/Z[ (34) /

NA

/

/

NA

/

PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTION (39) i

/1/7/ /0/0/0/ (37) (Z[ (38) /

NA

/

PERSONNEL INJURIES NUMBER DESCRIPTION (41)

/1/3/ /0/0/0/ (40) /

NA

/

LOSS OF OR DAMAGE TO FACIL11'Y (43)

TYPE

DESCRIPTION

/1/9/

[ZL (42) /

NA

/

PUBLICITY l

ISSUED DESCRIPTION (45)

NRC USE ONLY

/2/0/

[N/L (44) /

NA

/////////////

4 NAME OF PREPARER W. R. CARTWRIGHT PHONE (703) 894-5151 8012160 M

l I

^

1

)

i i

Virginia Electric and Power Company North Anna Power Station, Unit 2 Attachment: Page 1 of 1 Docker No. 50-339 Report No. LER 80-088/03L-0

Description of Event

On November 27, 1980 while operating in Mode 1 at 28% power, the containment pressure channel III failed high.

I Probable Consequences of Occurrence Since the operator placed channel III in the trip mode with in one hour, and there were three more pressure channels available, the health I

and safety of the public were not affected.

Cause of Event

I The pressure channel failed high because of a defective card in the circuit.

Immediate Corrective Action

The immediate corrective action was to verify that containment pressure was normal and place-the channel in the trip mode.

Scheduled Corrective Action i

There are no scheduled corrective actions.

Actions Taken to Prevent Reccurrence The defective circuit card was replaced and the channel restored to an operable status.

Generic Implications i

There are no generic implications.

e I

t i

l

(-

==- w w-+=w-w q--p%g an-9-7e-

+

y---

T y

,mp.

9-y7-y 99y y

,w_,

w-c-

v4

- p,-

--g g,

y y..

9 g--.,.-

,99y,,

,,w____

g pmey+--,-

+y-.--9p9-r9-m