Forwards IE Insp Rept 50-302/80-35 on 800914-17 & Notice of Violation.Notice of Violation Withheld (Ref 10CFR2.790)
ML19345D371
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 10/01/1980
From: Kenna W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hancock J
FLORIDA POWER CORP.
Shared Package
ML19345D370 List:
References
NUDOCS 8012120575
Download: ML19345D371 (2)


See also: IR 05000302/1980035

Text

W, TERT'.t TRASMTED HERE%1TH

CONTAINS 2.M MfDEMil3N

O #paactg

o

UNI TED STATES

l'

~g

NUCLEAR REGULATORY COMM:SSION

o

,

$

E

REGION il

y

o,

[

101 MARIETTA ST

N.W.. SulTE 310o

e

'

j'

ATLANT A. GEORGI A 30303

.....

yjgv Ref" 7 :

OCT 011980

50-302/80-35

Florida Power Corporation

ATTN:

J. A. Hancock, Director

Nuclear Operations

P. O. Box 14042, Mail Stop C-4

St. Petersburg, FL 33733

Gentlemen:

This refers to the inspection conducted by D. E. Moore of this office on

September 14-17, 1980, of activities authorized by NRC Operating License No.

DPR-12 at Crystal River and to the discussions of our findings held with

W. A. Cross at the conclusion of the inspection.

Areas examined during this inspection included your physical security program as

implemented under the provisions of Title 10, Code of Federal Regulations,

Part 73, " Physical Protection of Plants and Materials" and the specific

requirements of your approved Security Plan. Within these areas, the inspection

consisted of selective examinations of procedures and representative records,

interviews with personnel, performance tests, and observations by the inspector.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC raquirements. These items and references

to pertinent requirements are listed in the Notice of Violation enclosed herewith

as Appendix A.

This notice is sent to you pursuant to the provisions of Section

2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-

tions. Section 2.201 requires you to submit to this office, within 20 days of

your receipt of this notice, a written statement or explanation in reply including:

(1) corrective steps which have been taken by you and the results achieved;

(2) corrective steps which will be taken to avoid further noncompliance; and

(3) the date when full compliance will be achieved.

Details of activities

involving safeguards and security measures are exempt from disclosure in

accordance with 10 CFR 2.790(d).

Therefore, your response should be

incorporated in a separate paper and referenced in your reply.

In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, activities involving safeguards and

security measures are exempt from public disclosure; therefore, the enclosures

to this letter vitn the exception of the report cover page, which is an inspection

summary, will n_ri be plaat in the Public Documet. Room.

MATERt'lTWiSMiTTED HERE%TTH

" " " ' " " "

801212057S

.

, ,

.

..

.

_

.

_

_ - _ _ _ _ - _ _ - _ _

-

=-

.- -

.. --

-

_

-.-

. -

.

.-

.-

r;TentTianziTTEo Hanma

007 011980

/

'

C0HTA!NS 2.793!!; FORMAT!DN

.

Florida Power Corporation

-2-

e

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

I

Sincerely,

hhs

'

&

e . B. Kenna, Chief

,

l

W

q

Safe aards Branch

'

Enclosures:

1.

Appendix A, Notice of Violation

(Exempt from Disclosure)

'-

2.

Inspection Report No. 50-302/80-35

'

(Exempt from Disclosure)

3.

Inspection Summary

(Not Exempt)