Forwards IE Insp Rept 50-369/80-29 on 800924-26.No Noncompliance Noted
ML19345C945
Person / Time
Site: McGuire 
Issue date: 10/27/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19345C942 List:
References
NUDOCS 8012080649
Download: ML19345C945 (2)


See also: IR 05000369/1980029

Text

.

.

.

'

o

UNITED STATES

l'

g

NUCLEAR REGULATORY COMMISSION

o

5

a

REGION il

8

s

101 MARIETTA ST., N.W SulTE 3100

o

ATLANTA. GEORGIA 30303

o

          • e

OCT 2 7 w80

In Reply Refer To:

RII:WPA

50-369/80-29

Duke Power Company

ATTN:

W. O. Parker, Jr.

Vice President, Steam Production

P. O. Box 2178

Charlotte, NC 28242

Gentlemen:

This refers to the inspection conducted by W. P. Ang of this office on September 24

through 26, 1980 of activities authorized by NRC Construction Permit No. CPPR-83

for the McGuire Nuclear Station facility, and to the discussior: of our findings

held with J. C. Rogers at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

eaclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

Two new unresolved items resulted from this inspection and are discussed in the

enclosed report. These items will be examined during subsequent inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice". Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report wi.ll be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary infor-

mation identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

b

,'

'

C. E. Murphy,

ief [

>

-

Reactor Construction and Engineering

Support Branch

Enclosure:

See Page 2

'.

,

8012 080 (p

,

-

.

-O

s

Duke Power Company

-2-

OCT 2 7 F90

Enclosure:

Inspe tion Report No. 50-369/80-29

cc w/ encl:

M. D. McIntosh, Plant Manager

J. C. Rogers, Project Manager

-