Text
.
.
.
'
o
UNITED STATES
l'
g
NUCLEAR REGULATORY COMMISSION
o
5
- a
REGION il
8
s
101 MARIETTA ST., N.W SulTE 3100
o
ATLANTA. GEORGIA 30303
o
- e
OCT 2 7 w80
In Reply Refer To:
RII:WPA
50-369/80-29
Duke Power Company
ATTN:
W. O. Parker, Jr.
Vice President, Steam Production
P. O. Box 2178
Charlotte, NC 28242
Gentlemen:
This refers to the inspection conducted by W. P. Ang of this office on September 24
through 26, 1980 of activities authorized by NRC Construction Permit No. CPPR-83
for the McGuire Nuclear Station facility, and to the discussior: of our findings
held with J. C. Rogers at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
eaclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
Two new unresolved items resulted from this inspection and are discussed in the
enclosed report. These items will be examined during subsequent inspections.
In accordance with Section 2.790 of the NRC's " Rules of Practice". Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report wi.ll be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary infor-
mation identified in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
b
,'
'
C. E. Murphy,
ief [
>
-
Reactor Construction and Engineering
Support Branch
Enclosure:
See Page 2
'.
,
8012 080 (p
,
-
.
-O
s
Duke Power Company
-2-
OCT 2 7 F90
Enclosure:
Inspe tion Report No. 50-369/80-29
cc w/ encl:
M. D. McIntosh, Plant Manager
J. C. Rogers, Project Manager
-