| 05000219/LER-1980-001-01, /01T-o:on 800105,while Performing Electromatic Relief Valve Operability Test,Emergency Releie Valve D Failed to Open.Caused by Component Failure Due to Retainer Ring Being Backed Off Approx Six Threads | /01T-o:on 800105,while Performing Electromatic Relief Valve Operability Test,Emergency Releie Valve D Failed to Open.Caused by Component Failure Due to Retainer Ring Being Backed Off Approx Six Threads | |
| 05000219/LER-1980-001, Forwards LER 80-001/01T-0 | Forwards LER 80-001/01T-0 | |
| 05000219/LER-1980-002-03, /03L-0:on 800116,during Fuel Bundle Clip Insp,Fuel Bundle UD-3-023 Was Misoriented & Was Not Properly Seated in Core Cell Location.Caused by Personnel Error & Inadequate Procedural Controls.Procedure 205 Revised | /03L-0:on 800116,during Fuel Bundle Clip Insp,Fuel Bundle UD-3-023 Was Misoriented & Was Not Properly Seated in Core Cell Location.Caused by Personnel Error & Inadequate Procedural Controls.Procedure 205 Revised | |
| 05000219/LER-1980-002, Forwards LER 80-002/03L-0 | Forwards LER 80-002/03L-0 | |
| 05000219/LER-1980-003-01, /01T-0:on 800116,during Inservice Insp on Core Spray Sparger Piping for Sys Ii,Two Indications of Cracks Discovered.Ultrasonic Test Revealed through-wall Cracks. Possibly Caused by Sparger Installation Method | /01T-0:on 800116,during Inservice Insp on Core Spray Sparger Piping for Sys Ii,Two Indications of Cracks Discovered.Ultrasonic Test Revealed through-wall Cracks. Possibly Caused by Sparger Installation Method | |
| 05000219/LER-1980-003, Forwards LER 80-003/01T-0 | Forwards LER 80-003/01T-0 | |
| 05000219/LER-1980-004, Forwards LER 80-004/03L-0 | Forwards LER 80-004/03L-0 | |
| 05000219/LER-1980-004-03, /03L-0:on 800125,on 800125,29 & 0213,radioactive Water Discovered Leaking from Severely Pitted Aluminum Piping of Condensate Transfer Sys.Caused by Galvanic Corrosion.Leaks Temporarily Repaired & Piping to Be Replaced | /03L-0:on 800125,on 800125,29 & 0213,radioactive Water Discovered Leaking from Severely Pitted Aluminum Piping of Condensate Transfer Sys.Caused by Galvanic Corrosion.Leaks Temporarily Repaired & Piping to Be Replaced | |
| 05000219/LER-1980-005, Forwards LER 80-005/03L-0 | Forwards LER 80-005/03L-0 | |
| 05000219/LER-1980-005-03, /03L-0:on 800205,during Weekly Surveillance of Standby Gas Treatment Sys,Setpoints for Radiation Monitors RNO4A-1 & RNO4A-2 Found to Read Less Conservatively than Tech Spec.Caused by Personnel Error & Instrument Drift | /03L-0:on 800205,during Weekly Surveillance of Standby Gas Treatment Sys,Setpoints for Radiation Monitors RNO4A-1 & RNO4A-2 Found to Read Less Conservatively than Tech Spec.Caused by Personnel Error & Instrument Drift | |
| 05000219/LER-1980-006-03, /03L-0:on 800131,during Reactor Recirculation Flow Calibr surveillance,as-found Values of Recirculation Flow Sensors at Zero Percent Simulated Flow Were Out of Tolerance.Caused by Instrument Drift | /03L-0:on 800131,during Reactor Recirculation Flow Calibr surveillance,as-found Values of Recirculation Flow Sensors at Zero Percent Simulated Flow Were Out of Tolerance.Caused by Instrument Drift | |
| 05000219/LER-1980-006, Forwards LER 80-006/03L-0 | Forwards LER 80-006/03L-0 | |
| 05000219/LER-1980-007-03, /03L-0:on 800213,while Performing 10-h Test on Standby Gas Treatment Sys 1,flow Was Less than Tech Spec Limit.Caused by Slipping Drive Belts on Exhaust Fan EF1-8. Drive Belts Replaced | /03L-0:on 800213,while Performing 10-h Test on Standby Gas Treatment Sys 1,flow Was Less than Tech Spec Limit.Caused by Slipping Drive Belts on Exhaust Fan EF1-8. Drive Belts Replaced | |
| 05000219/LER-1980-007, Forwards LER 80-007/03L-0 | Forwards LER 80-007/03L-0 | |
| 05000219/LER-1980-008-01, /01T-0:on 800215,during Insp for IE Bulletin 79-14,discovered Nine Pipe Clamps Installed W/O Restraining Welded Lugs.Caused by Oversight During Const.Welded Lugs to Be Installed | /01T-0:on 800215,during Insp for IE Bulletin 79-14,discovered Nine Pipe Clamps Installed W/O Restraining Welded Lugs.Caused by Oversight During Const.Welded Lugs to Be Installed | |
| 05000219/LER-1980-008, Forwards LER 80-008/01T-0 | Forwards LER 80-008/01T-0 | |
| 05000219/LER-1980-009-03, During Annual Insp of Containment Spray Heat Exchanges,Leaks Discovered in Four Heat Exchangers.Caused by Component Failure & Design.Heat Exchangers to Be Retubed W/Titanium | During Annual Insp of Containment Spray Heat Exchanges,Leaks Discovered in Four Heat Exchangers.Caused by Component Failure & Design.Heat Exchangers to Be Retubed W/Titanium | |
| 05000219/LER-1980-009, Forwards Revised LER 80-009/03L-1 | Forwards Revised LER 80-009/03L-1 | |
| 05000219/LER-1980-010, Forwards LER 80-010/01T-0 | Forwards LER 80-010/01T-0 | |
| 05000219/LER-1980-010-01, /01T-0:on 800220,during IE Bulletin 79-14 Insp, Pipe hangers,NP-2-R8A & NP-2-R8B Found Improperly Installed. Cleanup Sys Restraint Mod & Nonrigid Restraint Added | /01T-0:on 800220,during IE Bulletin 79-14 Insp, Pipe hangers,NP-2-R8A & NP-2-R8B Found Improperly Installed. Cleanup Sys Restraint Mod & Nonrigid Restraint Added | |
| 05000219/LER-1980-010-03, /03L-1:on 790417,excavation Was Started to Repair Leak Near Inside Penetration within Pipe Tunnel.Activity Was Detected in Soil Near Dedt Line.Dedt Line Rerouted on 800316.Line Will Be Repaired | /03L-1:on 790417,excavation Was Started to Repair Leak Near Inside Penetration within Pipe Tunnel.Activity Was Detected in Soil Near Dedt Line.Dedt Line Rerouted on 800316.Line Will Be Repaired | |
| 05000219/LER-1980-011-03, /03L-0:on 800219,during Surveillance Test,Trip Occurred on Standby Gas Treatment Sys 1.Caused by Cracked Flow Sensing Line Which Was Probably Stepped On.Line Replaced | /03L-0:on 800219,during Surveillance Test,Trip Occurred on Standby Gas Treatment Sys 1.Caused by Cracked Flow Sensing Line Which Was Probably Stepped On.Line Replaced | |
| 05000219/LER-1980-011, Forwards LER 80-011/03L-0 | Forwards LER 80-011/03L-0 | |
| 05000219/LER-1980-012, Forwards LER 80-012/03L-0 | Forwards LER 80-012/03L-0 | |
| 05000219/LER-1980-012-03, /03L-0:on 800228,discovered That Weekly Surveillance Tests for Main Station & Diesel Generator Batteries Not Performed During Seventh Wk.Caused by Error in Personnel.Evaluation Will Be Made to Determine Improvements | /03L-0:on 800228,discovered That Weekly Surveillance Tests for Main Station & Diesel Generator Batteries Not Performed During Seventh Wk.Caused by Error in Personnel.Evaluation Will Be Made to Determine Improvements | |
| 05000219/LER-1980-013, Forwards LER 80-013/01T-0 | Forwards LER 80-013/01T-0 | |
| 05000219/LER-1980-013-01, /01T-0:on 800309,fire Suppression Water Sys Removed from Svc to Replace Cracked Valve,Contrary to Tech Specs.Fire Truck Pumper Used as Water Supply Backup. Cause of Valve Body Crack Under Investigation | /01T-0:on 800309,fire Suppression Water Sys Removed from Svc to Replace Cracked Valve,Contrary to Tech Specs.Fire Truck Pumper Used as Water Supply Backup. Cause of Valve Body Crack Under Investigation | |
| 05000219/LER-1980-014-01, /01T-0:on 800302,emergency Diesel Generator 1 Failed to Synchronize & Tripped When Generator 2 Was Tagged for Mod.Caused by Component Failure.Fuse F7,found Loose in Holder.Fuseholder Repaired | /01T-0:on 800302,emergency Diesel Generator 1 Failed to Synchronize & Tripped When Generator 2 Was Tagged for Mod.Caused by Component Failure.Fuse F7,found Loose in Holder.Fuseholder Repaired | |
| 05000219/LER-1980-014, Forwards LER 80-014/01T-0 | Forwards LER 80-014/01T-0 | |
| 05000219/LER-1980-015, Forwards LER 80-015/03L-0 | Forwards LER 80-015/03L-0 | |
| 05000219/LER-1980-015-03, /03L-0:on 800403,piston Rod on Closure Mechanism for Reactor Bldg Ventilation Automatic Isolation Valve Was Found Broken,Making Valve Inoperable.Caused by Component Failure.New Piston Rod Eye Stud Was Fabricated & Installed | /03L-0:on 800403,piston Rod on Closure Mechanism for Reactor Bldg Ventilation Automatic Isolation Valve Was Found Broken,Making Valve Inoperable.Caused by Component Failure.New Piston Rod Eye Stud Was Fabricated & Installed | |
| 05000219/LER-1980-016, Forwards LER 80-016/01T-0 | Forwards LER 80-016/01T-0 | |
| 05000219/LER-1980-016-01, /01T-0:on 800512,util Recognized That 800420 Discovery of Defective Pressure Switch,Psl D,Constituted Immediate Rept.Caused by Cocked Teflon Actuator.Switch Removed & Will Be Replaced | /01T-0:on 800512,util Recognized That 800420 Discovery of Defective Pressure Switch,Psl D,Constituted Immediate Rept.Caused by Cocked Teflon Actuator.Switch Removed & Will Be Replaced | |
| 05000219/LER-1980-017-01, /01T-0:on 800516,while Performing Control Rod Interference checks,green-green Rod Position Indication Remained Illuminated While Withdrawing Rod 10-23.Caused by Operator & Procedure in Bypass & Component Failure | /01T-0:on 800516,while Performing Control Rod Interference checks,green-green Rod Position Indication Remained Illuminated While Withdrawing Rod 10-23.Caused by Operator & Procedure in Bypass & Component Failure | |
| 05000219/LER-1980-017, /03L-0:on 800520,during Investigation of LER 80-17/1T, One Rod Free Travel Interlock Surveillance Requirements Not Performed as Required.Causec by Failure to Perform Procedure & Schedule Surveillance | /03L-0:on 800520,during Investigation of LER 80-17/1T, One Rod Free Travel Interlock Surveillance Requirements Not Performed as Required.Causec by Failure to Perform Procedure & Schedule Surveillance | |
| 05000219/LER-1980-018-03, /03L-0:on 800507,during Monthly Surveillance Testing of Reactor High Pressure Scram sensors,RE03D Found to Be Less Conservative than Specified.Caused by Sensor Repeatability.Sensor Reset | /03L-0:on 800507,during Monthly Surveillance Testing of Reactor High Pressure Scram sensors,RE03D Found to Be Less Conservative than Specified.Caused by Sensor Repeatability.Sensor Reset | |
| 05000219/LER-1980-018, Forwards LER 80-018/03L-0 | Forwards LER 80-018/03L-0 | |
| 05000219/LER-1980-020, Forwards LER 80-020/01T-0 | Forwards LER 80-020/01T-0 | |
| 05000219/LER-1980-020-01, /01T-0:on 800605,following Insp of Fire Barriers Protecting safety-related Areas,Several Penetrations Found in Degraded Condition.Caused by Deficiencies in Installation Specs & Personnel Error Re Delay in Establishing Watche | /01T-0:on 800605,following Insp of Fire Barriers Protecting safety-related Areas,Several Penetrations Found in Degraded Condition.Caused by Deficiencies in Installation Specs & Personnel Error Re Delay in Establishing Watches | |
| 05000219/LER-1980-021, Has Been Cancelled | Has Been Cancelled | |
| 05000219/LER-1980-022-03, /03L-0:on 800603,reactor High Pressure Isolation Condenser Initiation Switch Trip Points Found Less Conservative than Specified.Caused by Unusual Svc Condition. Pressure Switches Reset & Exercised to Ensure Operation | /03L-0:on 800603,reactor High Pressure Isolation Condenser Initiation Switch Trip Points Found Less Conservative than Specified.Caused by Unusual Svc Condition. Pressure Switches Reset & Exercised to Ensure Operation | |
| 05000219/LER-1980-022, Forwards LER 80-022/03L-0 | Forwards LER 80-022/03L-0 | |
| 05000219/LER-1980-023, Forwards LER 80-023/03L-0 | Forwards LER 80-023/03L-0 | |
| 05000219/LER-1980-023-03, /03L-0:on 800523,prior to Inservice Insp Reactor Vessel Hydro,Testing Revealed That Electromatic Relief Valve High Pressure Sensor IA83B Exceeded Tech Spec Setpoint. on 800531,sensor IA83F Found to Exceed Setpoint | /03L-0:on 800523,prior to Inservice Insp Reactor Vessel Hydro,Testing Revealed That Electromatic Relief Valve High Pressure Sensor IA83B Exceeded Tech Spec Setpoint. on 800531,sensor IA83F Found to Exceed Setpoint | |
| 05000219/LER-1980-024, Forwards LER 80-024/03L-0 | Forwards LER 80-024/03L-0 | |
| 05000219/LER-1980-025, Forwards LER 80-025/01T-0 | Forwards LER 80-025/01T-0 | |
| 05000219/LER-1980-025-01, /01T-0:on 800618,during Surveillance Test, Nonfunctioning Operator Discovered in Valves V-9-12 & V-9-8 Found Leaking.Caused by Component Failure.Defective Valves Replaced & Will Be Inspected.Revised Rept Will Follow | /01T-0:on 800618,during Surveillance Test, Nonfunctioning Operator Discovered in Valves V-9-12 & V-9-8 Found Leaking.Caused by Component Failure.Defective Valves Replaced & Will Be Inspected.Revised Rept Will Follow | |
| 05000219/LER-1980-026, Forwards LER 80-026/03L-0 | Forwards LER 80-026/03L-0 | |
| 05000219/LER-1980-026-03, /03L-0:on 800709,during Routine Testing Insp of Hydraulic Snubbers Installed in safety-related Sys,Snubber 75/5 Failed to Lock Up in Compression Direction.Caused by Foreign Matl in Snubber Fluid.Snubber Flushed & Refilled | /03L-0:on 800709,during Routine Testing Insp of Hydraulic Snubbers Installed in safety-related Sys,Snubber 75/5 Failed to Lock Up in Compression Direction.Caused by Foreign Matl in Snubber Fluid.Snubber Flushed & Refilled | |