ML19344F528

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-370/80-08 on 800616-19 & Notice of Violation
ML19344F528
Person / Time
Site: Mcguire
Issue date: 07/18/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19344F522 List:
References
NUDOCS 8009150372
Download: ML19344F528 (2)


See also: IR 05000370/1980008

Text

_

_ _ _ _ _ _

i

  • /

UNITED STATES

k'

y*

~ y,

NUCLEAR REGULATORY COMMISSION

f,

$

REGION 11

,

y'o$,

3 2

101 MARIETTA ST., N.W., SUITE 3100

"

ATLANTA, GEORGIA 30303

JUL 181980

In Reply Refer To:

RII:LDZ

50-370/80-08

Duke Power Company

ATTN:

W. O. Parker, Jr.

Vice President, Steam Production

P. O. Box 2178

Charlotte, NC 28242

Gentlemen:

This refers to the inspection conducted by L. D. Zajac of this of fice on June 16-19,

1980, of activities authorized by NRC Construction Permit Nos. CPPR-84 for the

McGuire facility, and to the discussion of our findings held with T. E. Touchstone

at the cenclusion of the ir.spection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Three new unresolved items resulted from this inspection and are discussed in

the enclosed report. These items will be examined during subsequent inspections.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements. This item and references

to pertinent requirements are listed in the Notice of Violation enclosed herewith

as Appendix A.

This notice is cent to you pursuant to the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

'

Section 2.201 requires you to submit to this office, within 20 days of your

receipt of this netice, a written statement or explanation in reply including:

(1) corrective steps which have been taken by you and the results achieved; (2)

corrective steps which will be taken to avoid forther noncompliance; and (3) the

date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Fart 2,

Title 10, Code of Federal Regulations,

a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document. If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

.

8009150p%

_

. . . _ _ .

,

.

--

. - - , - .

,

.

' '

,.

s

. ..

. . -

Duke Power Company

-2-

'

JU1L 18 ISEH)

.

  • ' Should you have any questions concerning this letter, we will be. glad to discuss

them with you.

Sincerely,

,,

-

bl

C. E. Murphy, Chief

Reactor Construction and Engineering

Support Branch

Enclosures:

1.

' Appendix A, Notice of Violation

2.

Inspection Report No. 50-370/80-08

cc w/ enc 1:

M. D. McIntosh, Plant Manager

J. C. Rogers, Project Manager

i

.

t

1

(

'

7'

4

d '.

,

!

.