UNITED STATES
k'
y*
~ y,
NUCLEAR REGULATORY COMMISSION
f,
$
REGION 11
,
y'o$,
3 2
101 MARIETTA ST., N.W., SUITE 3100
"
ATLANTA, GEORGIA 30303
JUL 181980
In Reply Refer To:
RII:LDZ
50-370/80-08
Duke Power Company
ATTN:
W. O. Parker, Jr.
Vice President, Steam Production
P. O. Box 2178
Charlotte, NC 28242
Gentlemen:
This refers to the inspection conducted by L. D. Zajac of this of fice on June 16-19,
1980, of activities authorized by NRC Construction Permit Nos. CPPR-84 for the
McGuire facility, and to the discussion of our findings held with T. E. Touchstone
at the cenclusion of the ir.spection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Three new unresolved items resulted from this inspection and are discussed in
the enclosed report. These items will be examined during subsequent inspections.
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with NRC requirements. This item and references
to pertinent requirements are listed in the Notice of Violation enclosed herewith
as Appendix A.
This notice is cent to you pursuant to the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
'
Section 2.201 requires you to submit to this office, within 20 days of your
receipt of this netice, a written statement or explanation in reply including:
(1) corrective steps which have been taken by you and the results achieved; (2)
corrective steps which will be taken to avoid forther noncompliance; and (3) the
date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Fart 2,
Title 10, Code of Federal Regulations,
a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document. If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
.
8009150p%
_
. . . _ _ .
,
.
--
. - - , - .
,
.
' '
- ,.
s
. ..
. . -
Duke Power Company
-2-
'
JU1L 18 ISEH)
.
- ' Should you have any questions concerning this letter, we will be. glad to discuss
them with you.
Sincerely,
,,
-
bl
C. E. Murphy, Chief
Reactor Construction and Engineering
Support Branch
Enclosures:
1.
' Appendix A, Notice of Violation
2.
Inspection Report No. 50-370/80-08
cc w/ enc 1:
M. D. McIntosh, Plant Manager
J. C. Rogers, Project Manager