ML19344F371

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-329/80-20 & 50-330/80-21 on 800708-10 & Notice of Violation
ML19344F371
Person / Time
Site: Midland
Issue date: 07/18/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML19344F372 List:
References
NUDOCS 8009150194
Download: ML19344F371 (2)


See also: IR 05000329/1980020

Text

,-

-

- - -

&

  1. ( ***:oq'o,,

c

-

UNITED STATES

8

NUCLEAR REGULATORY COMMISSION

,,

$

,I

REGION 111

799 ROOSEVELT ROAD

r

b

OLEN ELLYN. lLLINOIS 60137

o

.....

e

.

U1 18 G%

'

..

Docket No. 50-329

Docket No. 50-330

Consumers Power Company

ATTN:

Mr. Stephen H. Howell

Vice President

1945 West Parnall Road

.

Jackson, MI 49201

Gentlemen:

This refers to the inspection conducted by Mr. E. W. K. Lee of this office

on July 8-10, 1980, of activities at the Midland Nuclear Plant, Units 1

and 2, authorized by NRC Construction Permits No. CPPR-81 and No. CPPR-82

and to the discussion of our findings with Mr. R. G. Wollney, others of

your staff, and others of the site staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspecti'.,n consisted of

a selective examination of procedures and representative records, obser-

vations, and interviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as described in the enclosed Appendix A.

This notice is sent to you pursuant to the provisions of Section 2.201 of

the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-

tions.

Section 2.201 requires you to submit to this office within thirty

days of your receipt of this notice a written statement or explarration in

reply, including for each item of noncompliance:

(1) corrective action

taken and the results achieved; (2) corrective action to be taken to avoid

further noncompliance; and (3) the date when full compliance will be

'

achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter, the

enclosures, and your response to this letter will be placed in the NRC's

Public Document Room, except as follows.

If the enclosures contain

information that you or your contractors believe to be proprietary, you

8009150 /

<

._

o

.

_ --

. _ _ _

__

,

. c

-Consumers Power Company

-2-

${JL 1 g G30

,

must apply in writing to this office, within twenty days of your receipt

of this letter, to withhold such information from public disclosure. The

,

f

application must include o full statement of the reasons for which the

information is considered proprietary, and should be prep'ared so that

Proprietary information identified in the application is contained in an

enclosure to the application.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

4

GW

G. Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

1.

Appendix A, Noti--

of Violation

2.

IE Inspection Report No.

50-329/80-20 and No.

50-330/80-21

cc w/ encl:

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

"

TIC

Ronald Callen, Michigan Public

Service Commission

Myron M. Cherry, Chicago

.

L-

_$

..m