05000327/LER-1980-139-03, /03L:on 800807,during Operation in Mode 2,B Train Transfer Switch for Component Cooling Water Pump Supply Tripped on Three Occasions.Caused by Thermal Overload Assembly.Switches Modified by Defeating Overload Features

From kanterella
(Redirected from ML19344F120)
Jump to navigation Jump to search
/03L:on 800807,during Operation in Mode 2,B Train Transfer Switch for Component Cooling Water Pump Supply Tripped on Three Occasions.Caused by Thermal Overload Assembly.Switches Modified by Defeating Overload Features
ML19344F120
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 09/04/1980
From: Kirk G
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19344F103 List:
References
LER-80-139-03L, LER-80-139-3L, NUDOCS 8009120440
Download: ML19344F120 (2)


LER-1980-139, /03L:on 800807,during Operation in Mode 2,B Train Transfer Switch for Component Cooling Water Pump Supply Tripped on Three Occasions.Caused by Thermal Overload Assembly.Switches Modified by Defeating Overload Features
Event date:
Report date:
3271980139R03 - NRC Website

text

-

  • .e :'

u; FN * --

LICENShh kVhNI MhruMI

  • h,

~ ~ ~,

CONTROL Block: l ' 1 l

l l

1 l

, (PLE AsE PRINT oR TYPE ALL REQUIRED INFoRMAYlONI lo l1l l T I N IS.1 -Nl PI l @l O !O I-l 0l OI Ol O I O I - l010 l@l k l 1l 111 l1 l@l63 CAT w I

I l

,7 8.9 LaCENSEE CODE to 16 LICENSE NUmstm 26 2s LtCENSE Tvrt JO CON'T -

Io1iI

~,"l,'f,"C l Li@l 0I 5 I O i 0 lo i 31 217 l@l O I 81 017 l 810 )@l 019 I O I 4 I 810 l@

I, 8

40 64 DOCERT NUMetM GS 69 EVENT DATg 14 76 REPORT DAT E 80 EV NT DESCRIPTION AND PROBASLE CONSEQUENCES h 'B' train transfer switch for the Component l During normal operation in Mode 2, the J

io ;2l Cooling' Water pomp: power supply was found tripped open on three separate occasions. The. g

,,33 g system was declared inoperable and 'netion statemert of LCO 3 7 31 was entered on j

77g each occurrence. There was - no effcsct upon publi. bealth or safety. Previous

,,,,jg

~

occurrences-none.

,,,,yg 10621 1 I

l I o ;s 1 I so 1

sV.1"A.

Jun,

'an" s###.

co.o~ INT Ceo.

C joisi

) wi Bl@ l Al@.I E l@ lC lK lT lB lR lK l@ '.]@ -l Z l @

,o

.2 u

i 2.

stOuf NTI AL 00Cun*ENCE REPomT RtV'3 ton 4COE TvPE No EVbNT vf AR R EPQRT N$.

Lt Rino 1 "l 3 l lLl l__l

- l0l

@ avaoa7 0

1 1 3 l l

l-l I

10 I

l-l i

,,2 8 22 23 24 26 27 28 29 30 31 32 T

AC Of

. CN PLA T MET HOURS 22 s0 Y Fo US, SUPPL R MANU$&CTLRf4 i XI@l F lg. l Z lg l36Zl@ l 0l0l0 l0 l lYl@

lNl@

l Nl@

l Wl1l 2l0l 33 34 36 Ji 40 41 42 43 44 47 cAuSE DESCRIPTION AND CORRECTIVE ACTIONS

i ; o ; } On each of the first 2 occurrences the cause was not identified and the switch was

_)

,7,,,

l reset and the pump was returned to service. On the third occurrence, investigation 1

e7.s* *4 4

y#26l revealed the switch had a the mm1 ove' innd m mM r +4 ek n e na en w.

t i 131 1 design drawings.

__j 11,

  • I I se i-
- s 9 oiNta status @

$iE EN h

's'Ti.'I."

oisCovany ogsCnievieN seowta NA' l

l A l@l OPERATOR OBSERVATION j

IiItI[3_j @ l0l0lk!@l 80

'2riwTv ' Co$rtNT AucuNT os ACriviTv @ l toCATicN or mettAst h arLtast@o or nsLeastlZlgl NA l

NA S

MJ I einso.Est eneosvE s t

ecscaieTroN @

NUuesa -

Tver OI7Il01010l@lZl@)

NA 1

t.:o~~it,NJ',es d 1 OT0"lO ]g;-

l NA 3

8 s 31 12 80 LC55 08 04 DauaCE TO FACILITY Q.

Y t CESCR4* TION NA./

'}

igl l@l _

p 69.

10

@ b, t @Of CaerftON l

llll llll l1 (( l la l

' NA GN 3. M '

-- nm. nr %..

Phone

, ['

-=;

~

8009120440

?

t-

?

Tcnnrsso Vality Authority

.Sequoyah Nuclear Plant-

~

LER SUPPLEMENTAL INFORMATION SQRO-50-327/80139: ' Technical Specification Irvolved 3.7.3.l'

~

Reported Under Technical Specification' 6.9.1.13.b Date of Occurrences: 8/07/80

. Times of Occurrences: 1310 CDST 8/10/80 1900 CDST l

8/11/80 1430 CDST IdentificationandDescridtionofOccurrences:

1.

On 8/07/80 at 1310 CDST during normal operation, the Component Cooling. Water Pump C-5 would not start when Unit 2 Operator attempted to start the, pump in preparation for a preoperational test on shutdown board 2B2-B. The system was declared inoperable and the action statement of LCO 3.7.3.1 was entered.

=

Investigation revealed that the 'B' train transfer switch was open. The ASE closed the-switch at 1312 CDST, started the pump at 1320 CDST, and declared the system operable. ' Earlier at 1230 CDST the ASE had verified the transfer switch alignment.. The cause of the switch being open was unknown.

i i

2.

On-8/10/80 at 1900 CDST during normal operation, the Component Cooling Water Pump C-S 'B' train transfer switch was found tripped. The system was declared i-inoperable and action statement of'LCO 3.7.3.1 was entered.

The transfer switch was reset and the pump was started. The system was declared' operable at.1919 CDST. The cause of the open switch could not be determined.

3.

On 8/11/80 at 1430 CDST during normal operation, the component Cooling

' Water Pump C-S ':B' train. transfer switch was discovered tripped. The system was' declared inopersbie and action statement of LCO 3.7.3.1 was entered.

- Investigation revealed ~ that the transfer switch contains a thermal overload assembly. The overload. assembly is not specified on the design drawings.

The overloads were' replaced and-the pump returned to service.at 2350 CDST while an investigation was being made to determine if the design drawing was correct.-

Conditions Prior to occurrences:

Mode-2t 4% Power

' Apparent-Cause of Occurrence:

~

_ Improper switch-installed during construction. 13de transfer switch should not have a-thermal = overload assembly..

Follow-Uo Corrective Action:

The 'A' and4'B'; train transfer. switches will be modified by defeating their thermal overload' features.'

Failure-Data':

.None

~