Text
l
pur
.
'
&
'o
UNITED STATES
~s
,
!'
NUCLEAR REGULATORY COMMISSION
^
n
N
$
REGION V
Y
8
1990 N. CALIFORNI A BOULEVARD
E
o
SUITE 202, WALNUT CREEK PLAZA
e,,,*
WALNUT CREEK, CALIFORNIA 94596
.
JUL 7
1980
Docket No. 50-312
Sacramento Municipal Utility District
P. O. Box 15830
Sacramento, California 95813
Attention: Mr. John J. Mattimoe
Assistant General Manager and
Chief Engineer
Gentlemen:
Subject: NRC Inspection Report
This refers to the inspection conducted by Mr. G. P. Yuhas of this office
on June 9-13, 1930 of activities authorized by NRC License No. DPR-54, and
to the discussion of our findings held by Mr. Yuhas with Mr. McColligan and
other members of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the enclosed inspection
report. Within these areas, the inspection consisted of selective examinations
of procedures and representative records, interviews with personnel, and obser-
vations by the inspector.
Based on the results of this inspection, it appears that certain of your activities
were not conducted in full compliance with NRC requirements, as set forth in
the Notice of Violation, enclosed herewith as Appendix A.
These items of non-
compliance have been categorized into a level as described in our correspondence
to all NRC licensees dated December 31, 1974.
j
1
This notice is sent to you pursuant to the provisions of Section 2.201, of
the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Section 2.201 requires you to submit to this office, within twenty (20) days
of your receipt-af this notice, a written statement or explanation in reply
including (1) corrective steps which have been taken by you and the results
achieved; (2) corrective steps which will be taken to avoid further violations;
and (3) the date when full compliance will be achieved.
800. 870 3l3 .
i
8
-
-
_
__
_
.
.
.
.
.
Sacramento Municipal Utility District
-2-
JUL 7
1980
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you believe to be proprietary, it is
necessary that you submit a written application to this office, within 20 days
of the date of this letter, requesting that such infonnation be withheld from
public disclosure. The application must include a full statement of the reasons
why it is claimed that the information is proprietary.
The application should
be prepared so that any proprietary information identified is contained in
an enclosure to the application, since the application without the enclosure
will also be placed in the Public Document Room.
If we do not hear from you
in this regard within the specified period, the report will be placed in the
Public Document Room.
Should you have any questions concerning this inspection, we will be glad
to discuss them with you.
Sincerely,
W
a
,
H. E. Book, Chief
Fuel Facility and Materials
Safety Branch
Enclosures:
A.
B.
IE Inspection Report
No. 50-312/80-19
cc w/o enclosure B :
R. J. Rodriguez, SMUD
L. G. Schwieger, SMUD
...
"
w
e,