Text
__ __
!
f
an ner
[
UNITED STATES
Mdc/g
C
^
NUCLEAR REGULATORY COMMISSION
$
,E
REGION il
- .
'#
o
101 MARIETTA ST., N.W., SUITE 3100
o
ATLANTA. GEORGIA 30303
.....
h4AJR 131980
In Reply Refer To:
RII:JLS
50-395/80-1
South Carolina Electric and Gas Company
ATTN:
T. C. Nichols, Jr., Vice President
Power Production and Systems Operations
P. O. Box 764
Columbia, SC 29218
Gentlemen:
This refers to the inspection conducted by J. L. Skolds of this office on
Janua ry 1 31, 1980, of activities authorized by NRC Construction Permit No.
CPPR-94 for the V. C. Summer facility, and to the discussion of our findings
held i,ith 0. S. Bradham at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
During the inspection it was found that certain activities under your license
appear to be in noncompliance with NRC requirements. This item and references
to pertinent requirements are li'sted in the Notice of Violation enclosed here-
with as Appendix A.
Corrective actions to prevent recurrence were completed
i
prior to the conclusion of this inspection; therefore, a reply is not requested.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure'. Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document.
If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
..s
m.
.
.
4
O
\\
a
D O 'b
800428 0
i
,
t
South Carolin4 Electric and Gas
-2-
M&Q j 3 jggg
,;
Company
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
>
Sincerely,
t
E.c.
R. C.
e is, Acting Chief
Reactor Operations and Nuclear
[
Support Branch
'
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report No. 50-395/80-1
.
cc w/ enc 1:
A. A. Smith
Quality Assurance
P. O. Box 8
Jenkinsville, SC 29065
T. B. Conners, Jr.
Corners, Moore and Corber
1747 Pennsylvania Avenue, N.W.
Washington, DC 20006
0. S. Bradham, Manager
-
Nuclear Operations
P. O. Box 8
'
Jenkinsville, SC 29065
i
,
,e
.
T
.
..
.-