/03L-0:on 800911,containment Isolation Valve FCV-61-192 Took 20-s to Stroke Closed.Caused by Ice Buildup. No Subsequent Problems Have Been Experienced
ML19344B577
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 10/10/1980
From: Cottle W, Kirk G
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19344B575 List:
References
LER-80-157-03L, LER-80-157-3L, NUDOCS 8010210517
Download: ML19344B577 (2)


LER-1980-157, /03L-0:on 800911,containment Isolation Valve FCV-61-192 Took 20-s to Stroke Closed.Caused by Ice Buildup. No Subsequent Problems Have Been Experienced
Event date:
Report date:
3271980157R03 - NRC Website

text

O 8

a o mi o

n im L

J

~

m t. s v c a w L L. Lvwe ncruns CCNWCL BLOCK: l 1

I l

l 1

lh (PLE ASE PRINT CR TYPE alt REQUIRED INFORMATICN) 8 lo j t l l T l Nl Sl N IP ll Q l 010 }-10101010 10 l-l0 1 0l @ 4 Il 11 il l1 l@l l

lg i

8 9 LtCENSEE CCCE L'

16 LICENSE NUMS EE 25 26 LICEN5; Tvet 40

$3 CAT w CoirT IoiiI 3$.[*,"el l L }@l 0 ] 5 ] 0 l 0 l 0 l 3 l 2 l 7 'Q 0 [9 l1l1l8l Ogl 1[ 0 [1 l0 l8 p lg I

8 60 61 oOCK ET NuuSEM 68 69 EVENT oATE 74 7b REPORT o AT E 80 e

EVENT oESCRIPTION Af40 PROSABLE CONSECUENCES h [Di: } [ On 7/27/80 containnent isolation valve FCV-61-192 (glycol system isolation valve) took I o i a j i approximately twenty' seconds to stroke closed. This condition was noted by a test

[ o, ; } engineer but was not reported to the Shif t Engineer. The plant was subsequently ioj3) ; heated up to made C in apparent violation of Tech Spec 3.6.3.1.

There was no effect upon;

, o,3 ; ; public health or safety. Previous ocet.crences - none.

j jo}7)l l

[O{8l l l

7 8 9 80 SYSTEu

CAuSE

C A USE COM*.

VALVE CCCE CODE SUSCoOE Cou'oN E NT CODE SUSCOOE SUSCCOE l0 iE -

[,,S 1 dh [ El@ l 3 !@ lV l A lL l V l 0 l P @ (D l@ 'l Z [ @

7 8

9 10 11 1;

la 18 13 20 S E QU E N TI A L CtCUnaENCE AEPomT R E vt31oN EVENTvEAa REeOnT Ng,

.CCC TvPE No b [LE Plaol8 } O!

l_l l1 l5 j e l lg l 0' l l

lLl g

l0 ]

Mg; a

25 2;

23 24 26 77 IB 23 30 Ji 32 AC'10N suTunt tssECT swuTOow s ATT AC we t NT NP n o-a PRiuf Cou*

'Ou'CNENT a

T A at E ra ACTICr4 ON*LaNT uf7MCO M URS SUS ue T T E D f orsu bus.

LIE A uAw AC e EJI N j @ SVP l@

fj g

ja g Y

P l@!

l@

I l@

1 1@

l I

I l

l@

I l

.4 4

.3 36 37 40 el 4;

43 44 gy cAusE oEsORIPTioN ANO CORRECTIVE ACTIONS @

I,ol[ The test en
;ineer who noted the condition was not aware that FC"-61-192 was a i'lilI contain=ent isolation valve and that Technical Specifications specified a maxi =um valve actuation time of ten seconds. Ice buildup on FCV-61-192 caused valve to I !:t 1 stroke slowly. Subsequent cycling of valve has revealed no problems.

!?.+iI E i ac s

r.u.a n -

es T,4co es 5 7 A T ' .

  • *Cvvf A oTHER STA TL,5 Ot$CCVt"Y OsSCOVERY CESCAtPTION fi!SllCl@ l0l010l@l NA l

l D l@l NRC Review i

AC i r/t iv CONTErJT

  1. ELEAlg: Or nELC AM AMOV**T o$ ACTIVtTV L OCATICN CF RE LE ASE lt j 6l lz !

}lz l

NA l

[

NA l

7 8 9 to it 44 45 30

'!'ISONNE L Ele *C5ya ES N J9s t A

'vPE CESCa'* TION 7 } l 0 i 010 j@lZ l@l Nn 1

l1 i 7

8 9 9t t;

12 30 ego 00NNE L INJun'E5 Nvueg o OESCa'*TtCN lt lg i l 01010 g NA t

8 9 a

E:

LC 5 C8 C# OauaCE TC 8 AC6LiTv

've t C E sC aie +.+ N l l I 9,* !.

h v.

7

& 9

'O y

,m l G L.,0% @

~ac

~-

f230l NE l

ll l l IlIl l.I,f j

i 8 9

'O 68 69 12 T. Cettle/G. 3. Kirk g 010210 p.e.7". Pre:are-Ph: e o s-342-826L-

o Tennessee Valley Authority Sequoyah Nuclear Plant LER SUPPLD'. ENTAL INFORMATION SQRO-50-327/80157 Technical Specificatien Involved 3.6.3.1 Reported Under Technical Specification:

6.9.1.13.c Date of Occurrence: 9/11/80 Identification and Description of Occurrence:

An entry in a test engineer's daily log dated 7/27/80 noted that FCV-61-192 took approxi=ately twenty seconds to stroke closed (timed with wrist watch).

The test engineer was trouble shooting problems identified during the per-formance of TVA-56, ESF Reset Controls. The cycling of FCV-61-192 was not a part of the for=al test and, as sach no acceptance criteria was given. The test engineer did not identify that condition t.o the Shift Engineer and no subsequent action was taken on the valve. The condition was identified on 9/11/80 during a NRC review of T7A-56 date.

Conditions Prior to Occurrence:

Unit 1 in rede 5.

Testing in progress for ESF reset design verification.

Action specified in the Technical Specification Surveillance Requirenents net due to inocerable ecuipment.

N/A Accarent Cause of Occurrence:

Ice buildup on FCV-61-192 caused valve to cycle slower than design.

Analvsis of Occurrence:

A review of the surveillance testing on FCV-61-192 prior to and af ter 7/27/80 revealed the following:

Date Time 6/130lIO 7.5 See 8/24/80 9.2 See Excess coisture apparently resulted in a buildup of ice on the valve. Cycling of the valve on 7/27/80 freed the valve up and subsequent operation has been satisfactory.

Corrective Action

Valve cycle times were reviewed with no indication of valve inoperability either prior to or following the condition noted on 7/27/80. Operating experience of all glycol isolation valves will be reviewed to deter =ine if a routine progran of cycling these valves is warranted.

All preoperational test personnel have beta cautioned to identify discrepancies noted during testing to the Shift Engineer if the discrepancy involves Unit i equipcent.