05000368/LER-1980-053-03, /03L-0:on 800721,CEAC 1 Failed During Mode 1 Operation.Cause Not Determined.Ceac Sys Software Reloaded, Periodic Tests Performed & Failure Indications Returned to Normal.Ceac Returned to Operable Status on All Channels

From kanterella
(Redirected from ML19344B088)
Jump to navigation Jump to search
/03L-0:on 800721,CEAC 1 Failed During Mode 1 Operation.Cause Not Determined.Ceac Sys Software Reloaded, Periodic Tests Performed & Failure Indications Returned to Normal.Ceac Returned to Operable Status on All Channels
ML19344B088
Person / Time
Site: Arkansas Nuclear 
Issue date: 08/19/1980
From: Pendergraft R
ARKANSAS POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19344B085 List:
References
LER-80-053-03L, LER-80-53-3L, NUDOCS 8008250552
Download: ML19344B088 (1)


LER-1980-053, /03L-0:on 800721,CEAC 1 Failed During Mode 1 Operation.Cause Not Determined.Ceac Sys Software Reloaded, Periodic Tests Performed & Failure Indications Returned to Normal.Ceac Returned to Operable Status on All Channels
Event date:
Report date:
3681980053R03 - NRC Website

text

v7 V

o e

U. 5. NUCLE AR REGULATORY COMMis$ SON NRC FORM 366 LICENSEE EVENT REPORT EXHtBIT A (1 ill CONTROL SLOCK: l l l l l l lh (PLE ASE PRINT OR TYPE ALL REQUIRED INFORMATION)

@ l AlR l Al Nj ol 2Jg 0l0 [-]0 l0 l 0] Oj 0l-l0 jo jg l1 l 1l1 l 1lgl l lg 7

8 9 UCENSEE CODE to il LsCENsf NuwsER 25 26 LackNSE BY,& JG b7 CAT S8

% LL_J@l0 i s p !0101316181@69i 0 i7 12 l1 1810 1@l 0181119 18101@

CON'T o

7 8

60 6'

OOCsLET NUMSEq 68 EVENT DATE 34 F5 HEPORTDATE 80 EVENT DESCRIPT80N AND PROSABLE CONSEQUENCES 1o 12 i During Mode 1 operation, CEAC r failed.

CEAC #1 was placed in the inop-l i erable mode on all four CPC channels. CEAC #2 remained operable.

CEA o

io p i i positions were monitored at four hour intervals per Tech Spec Table 3.3-11 lo is! I Action Sa. This occurrence is similar to LER's 50-368/79-073 and 79-004.I l Reportable per Tech Spec 6.9.1.9.b.

i os i

f5Tr1 i l

o 8 l

80 C E LCDE

$U9C E (QMPONENT COut NU i ut 5

DE 8

II l A l@ LE_J@ LEJ@ l I IN I S I TIR I U!@ LYJ@ Lzj @

7 8

9 44

  1. 1 52 33 in 19 20 if gg ENTvtam E ORT o C J T

@,q:g,RO i 8 I 01

[-j i 015l3 i y

1013I i

L,-J L) g 21 22 23 24 2G 27 28

.M Jo 3

31 T Ast E N AC 0 PLA T wT MOUR$ 22 5 B #T D

,0

$UPPLi MAN FA TURER LEJ@l2J@ LZJ@

Lzj@

l 010 I Oiu I L!!.J@

LNj@ gj@ lC l4] 91 0l@

3J 34 3b M

33 40 el 42 43 44 47 CAUSE DESCRIPTION AND CORREC flVE ACTIONS The CEAC iInvestigation did not reveal the cause for CEAC #1 failure.

i o Frrri i system software was reloaded and a system periodic test was performed.

i m i ollowing the software reload of CEAC #1, the failure indications returneq F

, 3 i to normal.

CEAC #1 was returned to operable status on all CPC channels.

i I

i.

M DMCOVEHv oE$CHof f,0N D5'dj@Y!

NA l

$TA 5 APOWER OTHEHSTATUS l

8 L.EJ@ l1l 0l0 l@lPower Ops l

[

.0 45 a

' TENT

".A,v,T,

.MOuN, o,,C1,v,n @.

10C.,,0N O,, E u.s, @

CO Eu.sEO@0, alaistII_.J@l NA l

l NA l

L2_J

' c

=0 E.,0N~a E.,0s#Es of,C..1,0N @

nuo.E.

TV,E 10101 Ol@LZ_J@l NA l

i 2

=

)

,E,.sONN E'L',~,v'4Es NUM9ER D E SCR,* TION l

A 101010 l@l NA l

i, i2

'S ' " &^C"^ %'

c'"" @

8 L7 @l NA j

J 50 PUBL, Ty NRC USE ONLY E l.H.j @ DESCaiPT,0N t$$UED l

NA 1 l;;;;;;;;,;;l I

I L$

e,*J pg O O

'O

[

NAME OF PREPARER PHONE.

8 00825 n.T 5'S