Text
wn
[o
h
UNITED STATES
s
q
[" )y
j
NUCLEAR REGULATORY COMMISSION
,
g
,e
REGION til
e
8
799 ROOSEVELT ROAD
o
GLEN ELLYN. ILLINOIS 60137
.....
'JUL 1 1 1980
Docket No. 50-483
Union Electric Company
ATU:
Mr. John K. Bryan
Vice President - Nuclear
Post Office Box 149
St. Louis, MO 63166
Gentlemen:
This refers to the routine inspection conducted by Mr. W. B. Grant and
Mr. M. P. Phillips of this office on June 26 and 27, 1980, of activities
at the Callaway Plant, Unit 1 authorized by NRC Construction Permit No.
CPPR-139 dated April 16, 1976, and to the discussion of our findings with
Mr. R. L. Powers and others of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined
during the inspection. Within these areas, the inspection consisted of
a selective examination of procedures and representative records, obser-
vations, and interviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as described in the enclosed Appendix A.
This notice is sent to you pursuant to the provisions of Section 2.201 of
ie NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-
tions. Section 2.201 reqaires you to submit to this office within twenty
days of you. receipt of this notice a written statement or explanation in
reply, including for each item of noncompliance:
(1) corrective action
taken and the results achieved; (2) corrective action to be taken to avoid
further noncompliance; and (3) the date when full compliance will be
achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
!
2, Title 10, Code of Federal Regulamions, a copy of this letter, the
enclosures, and your response to this letter will be placed in the NRC's
Public Document Room, except as follows.
If the enclosures contain
information that you or your contractors believe to be proprietary, you
must apply in writing to this office, within twenty days of your receipt
of this letter, to withhold such information from public disclosure.
800320'O$yf
r-
3
.
Union Electric Company
-2-
g (,, 3 i t;ll;
The application must include a full stitement of the reasons for which the
information is considered proprietary, and .should be prepared so that
proprietary information identified in the application is contained in an
enclosure to the application.
We will gladly discuss any questions you have concerning this inspection.
,
Sincerely,
J
A. B. Davis, Chief
Fuel Facility ond
Materials Safety Branch
Enclosures:
4
1.
Appendix A, Notice
of Violation
2.
IE Inspection Report
No. 50-483/80-17
cc J/ enc 1:
Mr. W. H. Weber, Manager
Nuclear Construction
Central Files
Reproduction Unit NRC 20b
Local PDR
Regions I and IV
Ms. K. Drey
Mr. Ronald Fluegge, Utility
Division, Missouri Public
Service Commission
o