05000327/LER-1981-026-01, /01T-0:on 810310,analysis of Primary Containment Airlock Electrical Penetrations Revealed Probable Leak Paths Under Accident Conditions.Caused by Design Failure to Evaluate Sealing Matl.New Cables,Conduits & Seals Ordered

From kanterella
(Redirected from ML19343C802)
Jump to navigation Jump to search
/01T-0:on 810310,analysis of Primary Containment Airlock Electrical Penetrations Revealed Probable Leak Paths Under Accident Conditions.Caused by Design Failure to Evaluate Sealing Matl.New Cables,Conduits & Seals Ordered
ML19343C802
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 03/18/1981
From: Maddox S, Mcgriff J
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19343C798 List:
References
LER-81-026-01T, LER-81-26-1T, NUDOCS 8103250306
Download: ML19343C802 (2)


LER-1981-026, /01T-0:on 810310,analysis of Primary Containment Airlock Electrical Penetrations Revealed Probable Leak Paths Under Accident Conditions.Caused by Design Failure to Evaluate Sealing Matl.New Cables,Conduits & Seals Ordered
Event date:
Report date:
3271981026R01 - NRC Website

text

.0 ~.

,.c ~

tetEAsE raiNT on Tyre Au. nEOuinEo iN,owaTioN l

Contact si.Ocx: I1 I

1 1

I i

~

FoTil lT l N 1 s IN IP '!1 !@l n I o I I n l 0 I o l o l o l f o Io I@I 4 l 1 I'1 I 11 1l@[ l l@

I4 1$

L1CsN$sNuwetA AS 26 LICENss Tyrs 40

&# Chi hv i-3 8 9 f fCEN$tt CGot f57T1

,"',', % I t @lo i s lo lo 1013 1217 @l01,111o1811 @lnl,14 1 a l, I, l@

CONT 60 6I onCMIT NUwetN 04 69 sVENT DAfg to IS RtPCAT oat t 80 3

s EVENT OESCRiPTION ANO PRCS A81.E CONSECUENCES h airlo'ck electrical eenetrations are sealed with unqualified,

[.

Io!7l l ne ori-nev rene

  • nt This analvs'is is based on the as.sumption g

T3Ti'l I indeterminate, or nonexistent materials.

Primarv 1

I o I e } I that the inboard p5rsonnel airlock door is ocen or its seal' is breached.

leak paths through these conduits could open, remain open, and leak as'long I

Io ts1 l containment lo}6l l as pressure in the containment exceeds that of the auxiliary b'uikdin2.

I l

o 7 l

1 10!81I so CCup.

vai,v t systru cAust cAust CCCE CODE *

$USCODE CousoNENT COQt SUSGoot SUSCCot l0i9l l 9i Alh h,

h l D! vl'TIviT lD l h W h ' d f h 7

8 9

to It

.2 83 15 13 70

$# 0 urn 78 AL OCCURRENCE

  • ptPoMT REVt33ON LE R EVENT YE AR M EPonT No.

.COct TYPs No.

@,ag/Ro 18 11 l l-.]

101216 l M

l o "Il I W

j,---J

' Lo_]

_s, n

n 2.

2.

n 2.

2, n

u n

Av7ACMutNT N* n D-4 Pntutccup CourCN8NT l

Tantra ACTION ONPLANT MafMoo HoVRS Sueuaffto P enne nus, suppLitR.

MANUS ACTURER ACTION FUTUng EpstCT SMu?OCwN LF,Jgl34Al@

l Zl@

[Z_J@

[010lol I

W@

[N_j@

I I. l@

l XI 919 i 9) l 47 33 33 36 37 40 el 42 43 44 CAUSE OESCRIPTION AND CORRECTIVE ACTIONS IiloiI Des'ian failed to eval'uate the eenetration sealine material for the environment that i

lili1 I would be present durint an accident condition. The interim corrective action was to I

'The airlocks l remove the cables, stub the conduit at the airlock, and cap the conduit.

i,,2j

} were successfully leak tested after modification was ma'de.

New qualified cables, con-l i,,3; i5,.; { duits, and seals Mill be installed later.

80 s

s i ovatnsTATus h EsSNv' oiscovany ossCniPTrow h

's'rYN.'

sPonte j

Ii t s i Lc.J@ l o I o I o l@l NA I

Lp,j@l Natif4 cation by Desten 80 Acb.,v Co'aTENr AMOUNT CF ACTivlTY @ l LoCATICN OF AELEA$t l

att Aste or ntLE ASE l

NA li t o l I Zi @ lz l@l NA 80 7

8 9 to is A4 45 PtnsoNNEL Exposuets

.~

I NOUSER TYPE Ct$CRIPflCN lil1Iolofol@lZ(@l NA ii i:

PtatoNNELNJUnit$

NUwe:R otsCnietioN

^

L!drJ f oi ol ol@l NA 30 F

8 9 st 82 LC1108 On OAuAct to FACILITY Q l

Tvet ossCarettoN V.;/

[j,j,,'l,jiZl@l NA so

^

~"-~ ~~ "

T NRC USE ONL v

,UnuCTv I

i IIIIIilIIIII ts5U20 OtSCRIPTION Li.J ej Ld@l

,a 8

. s to

~"

Phone (615) 8/42-8317 _

Name of Preparer S. G. "addor/J. M. McGriff.

'~

' ' ' ' - ~ ~ ~ ~ ~ '

8 2' @ N b

  • =

o-l l

PART 21 REPORT NCR SQNEEB8108 i

LER SQRO-50-327/81026 Originating Document No. PRO l-81-055 Plant Seouovah Nuclear Plant, Unit 1 i

Component or System Identification Primary containe.ent airlock electrical penetrations Supplier of Component Nature of Defect or Noncompliance Ekch oersonnel airlock has two (2) 1" and one (1) 2" conduits that are nealed with chico A comoound in an EYS explosion-proof seal-ing condulet or RTV silicone rubber in a "C" or "L" type condulet. These materials will not maintain a seal against steam pressure.

Extent of Safety llazard Failure could cause leak rate of entire containment to exceed the value allowed by 10 CFR 50 and/or cause radiation release to exceed that allowed by 10 CFR 100.

Date Which Defect or Noncompliance Was Discovered 3/10/81 Number of Identical Components in Use 6 (4-1", 2-2") per unit Location of Components Personnel airlocks at elevation 734 and 690 t

l Corrective Action Taken or To Be Taken Interim corrective action-cables were re-i

- moved, conduits stubbed at airlocks, caps installed on conduits, and leak tested.

Permanent design change will install new conduit, cable and qualified sealing material.

~

Interim corrective actions have been Length of Time Required to Complete Action accomolished and verified by a satisfactory leak rate test. The permanent modi-fications will be accomplished during outages.

- Has defect or noncompliance been reported previously? Yes No X

If yes, by what means?

4 4