05000296/LER-1981-011-03, /03L-0:on 810224,coupling Damage Was Found on 3DA Rmov Bd MG Set.Caused by Misalignment & Loss of Lubricant.Coupling Seal Found Separated.Mg Set Realigned, Coupling Replaced & All Other Set Couplings Repaired

From kanterella
(Redirected from ML19343C590)
Jump to navigation Jump to search
/03L-0:on 810224,coupling Damage Was Found on 3DA Rmov Bd MG Set.Caused by Misalignment & Loss of Lubricant.Coupling Seal Found Separated.Mg Set Realigned, Coupling Replaced & All Other Set Couplings Repaired
ML19343C590
Person / Time
Site: Browns Ferry 
Issue date: 03/18/1981
From:
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19343C589 List:
References
LER-81-011-03L, LER-81-11-3L, NUDOCS 8103240549
Download: ML19343C590 (2)


LER-1981-011, /03L-0:on 810224,coupling Damage Was Found on 3DA Rmov Bd MG Set.Caused by Misalignment & Loss of Lubricant.Coupling Seal Found Separated.Mg Set Realigned, Coupling Replaced & All Other Set Couplings Repaired
Event date:
Report date:
2961981011R03 - NRC Website

text

.

. v LICENSEE EVENT REPORT CONTROL BLOCK: l l

l l

l l

lh (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 1 6

lo t i l [ Al Ll B l Rl FI 3l@l 0 l O l -l O ! O! 0 l o l o l _ l q l n lhl 4 l 1 l 1 l 1 l 1 l@l l

l@

i 8 9 LICENSEE CODE le 15 LICENSE NUMSER 25 26 LICENSE TYPE Jo 57 CAT 54 CON'T lolil l'Rc l L]@l 0l 510l 0l 012l 9l 6 @l 0l 2 l 21418l 1 @l 0 l 3 l 1l 8 l 8 l 1 l@

7 8

60 61 DOCKET NUM8 E R 68 69 EVENT DATE 14 75 REPORT O ATE 80 VENT DESCRIPTION AND PROBABLE CONSEQUENCES h 1:

fol2l l Following routine shutdown, 3DA RMOV Bd. MG set was removed from service to l

I o 131 I investigate shaft thrust and vibration. Upon inspection coupling damage was found l

Io Ia i I (generator to flywheel). Reference 3.9.B.11.

3DN RMOV Bd. MG set operational.

l lo Isl i No danger to pi:blic health or safety. No previous occurrence.

l lo is ] I l

10171 I I

I l o is i l 8'

7 8 9 SYSTEM

CAUSE

CAUSE COMP.

VALVE CCDE CODE SU8 CODE COMPONENT CODE SUSCCDE SUSCODE l o t il IE lB l@ ]@ W@ lM lE lC lF lU lN l@ {@ { @

J 8

9 to 11 12 13 18 19 20 SEQUENTI AL.

OCCURRENCE REPORT R EVISICN LER/Ro EVENT YEAR REPORT NO.

CODE TYPE N O.

@REgRT l8 l1l l_l l0l1l1l l/l l 0l 3l l Ll l_l

{

_ 21 22 23 24 26 27 28 29 30 31 32 TA N ACT N ONP NT E

HOURS

. S8 I E FOR 8.

SU U MANUFACTURER lCl@lGl@ W @

l Zl@

l010l1l2l W@

lN l@

l Ll@

lW l0 l1 l6 l@

33 J4 35 J6 37 40 43 42 43 44 47 CAUSE OESCRIPTION AND CORRECTIVE ACTIONS h I i l o I l Coupling damage due to misalienment and loss of lubricant in coupline. Coucline j

W l seal found separated. Realiened MG set. replaced coupline. lubricated and I

Ii 7l l repaired all other MG set couolines.

Increased frequancv of monitoring on all I

13 l MG se t s.

Waldron. 2 P Powerling. 5-3/8 0.D. X 1/4 inches, coupline seal.

l I

i liIAII 80

\\

I 4 3 oTwER STATUS hoiSSSRv' h

's'T"$$$

oiScovERv oESCRiPrioN s.OwER NA l

l B l@l Maintenance inspection l

It iS l l Dlh l 0 l 0 l 0 l@l

' Jnv,Tv COLNT RELEASED CF RELE ASE AUoVNT OF ACTIVITY LOCATION oF RELEASE NA I

l NA l

l li le I LzJ @ Lt]@l

.ER$cNNEL E,.JES l

oESCm.nON@

Nu,uE R rYPE NA l

l l i i e l 1 01 01 O l@l zl@l

' P,RsoNNEL iNJES 0,$cmPno~@

NUMe NA l

l i l : l l 0 l' 0 l 0 lhl r

"a II 12.

. 80 LOSS OF QR O AMAGE TO FACILITV t

fvPF D ESCRIP nON NA l

R9 Q@l

< j tu SO

.ummy NRC USE ONLY NA l

lll1lllllllllg1 t"S,U E D OESCWPTION W LNjhl 68 69 40 E

e j 13 NAVE OF PREPARER PHONE:

Ca cas4 O M9

4

':ee Wiley Authority' Form BF-17 F rry Nuclear Plant B F 1.5. 2 1.10.79 LER SUPPLEMENTAL INFORMATION 296 /

81011 Technical Sp. eilteapon luvolved 3.9.A.4.f and 3.9.3.11 w

J,

.1 i'nder Technical Specification 6.7.2.b(2) 0 do

.)ccurrence 2/24/81~

Time of Occurrence 0600 Unit 3

' q' S n!!,an nnd Description'of Occurrence:

3DA RMOV Bd. MG set was removed from service due to excessive thrust and vibration.

Upon. inspection coupling damage was found (generator to flywheel).

< noi'i ns,; Prior to Occurrence:

Unit:1 @ 98%

Unit 2 @ 101%

Unit 3-@ 0%

A cti n spm:ified in the Technical Specification Surveillance Requirements ma dy -.r.ep3r@le eiu,ipment. Describe.

- NA f 4 ' su..e 9: Occurr+ nee:

Coupling damaged due to misalignment and loss of lubricant in coupling. That coupling seal was found separated. There was excessive wear on the coupling gear teeth.

.'f Orrurrent:e; 41

'J There was'no damage to plant equipment. There.was no activity release, no personnel exposure or injury and no danger to the health or safety of the public.

s (%r* *; iv e-Action :

'The MG set was realigned, the coupling was replaced, all other MG set couplings were lubricated..The frequency'for vibration monitoring was increased. Also-initiated an anhlysis of the coupling failure-mode and the lubricant. 3EN coupling was changed due to similar damage.

" uit re-i][itjt :

NA ~

~~

Period - Lifetime; 'llesponsibility - Administrative Supersisor W i utien: (3 g p -

-..n :..Yn s.z v I

7.