Forwards IE Insp Rept 50-483/80-27 on 801103-07 & 12-14 & Notice of Violation
ML19343B861
Person / Time
Site: Callaway 
Issue date: 01/06/1981
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Bryan J
UNION ELECTRIC CO.
Shared Package
ML19343B862 List:
References
NUDOCS 8102170556
Download: ML19343B861 (2)


See also: IR 05000483/1980027

Text

4

I' .

.

[p2He

o

UNITED STATES

[ "

,,

",,g

NUCLEAR REGULATORY COMMISSION

e

REGION 111

.

o,

[

799 ROOSEVELT ROA3

% . . . . .

e

.

GLEN ELLYN, ILLINOIS 6o137

.~

.

,

JJAN

6 '20

4

%

Docket No. 50-483

Union Electric Company

i:

810/gg7"4

4 8 tag %=ld'*#

ATTN:

Mr. John Bryan

L

"

%

Vice President - Nuclear

P. O. Box 149

\\

,=

.

gI'

St. Louis, M0. 63166

g

Gentlemen:

This refers to the routine inspection conducted by Messrs. H. M. Wescott,

W. A. Hansen, K. R. Naidu, and R. Landsman of this office on November 3-7

and 12-14, 1980, of activities at General Offices in St. Louis, Missouri,

and the Callaway Plant, Unit 1, authorized by NRC Construction Permit

No. CPPR-139 and to the discussion of our findings with Mr. Weber and

others of the Callaway staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspectior. consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as described in the enclosed Appendix A.

With respect to item 2.a the inspection showed that action had been taken

to correct the identified noncompliance and to prevent recurrence.

Consequently, no reply to this item of noncompliance is required and we

have no further questions regarding this matter at this time.

Regarding the remaining item, a written response is required.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter, the enclosures,

and your response to this letter will be placed in the NRC's Public Document

Room, except as follows.

If the enclosures contain information that you or

your contractors believe to be proprietary, you must apply in writing to

this office, within twenty-five days of the date of this letter, to withhold

such information from public disclosure. The application must include a full

statement of the reasons for which the information is considered proprietary,

and should be prepared so that proprietary information identified in the

application is contained in an enclosure to the application.

.

.

- -

.

. - . -

.

,

.

'

'

Union Electric Company

-2-

JA P,8 6@

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

/

.

h

D A'f L

G. Fiorelli', Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Report

No. 50-483/80-27

cc w/encls:

W. H. Weber, Manager

Nuclear Construction

Central Files

.

..

.

Reproduction Unit NRC 20b

'*

PDR

[

Local PDR

!

NSIC

.i

TIC

l

- Regions I & IV

!

K. Drey

i

Ronald Fluegge, Utility

Divison, Missouri.Public

.[

Service Commi aion

'

l

-;

>

s

i

,

,

)

'

!

.

!

'

I

r

6

5

t_

[

i

.

-

.

.

i

i

I.

. .

.

.

. =

. t

.

.

.

.

. -

.

- -

-

- . .