Forwards LERs 80-028/03L-0,80-029/03L-0 & 80-030/03L-0
Date released: 12/23/2019 Download: ML19343A219


LER 80-030/03L-0:on 800812,during Routine Operation, Containment Air Temp Exceeded 120 F.Caused by Svc Water Temp Control Valve to Reactor Bldg Closed Cooling Water Heat Exchangers Being Set Too High.Valve Readjusted
ML19343A226
Person / Time
Site: Millstone Dominion icon.png
Issue date: 09/08/1980
From: Harris J
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19343A226 (1)
LER 80-029/03L-0:on 800812,during Surveillance Test on 12 U diesel,125 Vdc Ground Alarm Received.Caused by Frayed Insulation on Wire in Bendix Connector Allowing Contact Between Bare Wire & Connector Shell.Wire Recovered
ML19343A224
Person / Time
Site: Millstone Dominion icon.png
Issue date: 09/08/1980
From: Harris J
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19343A224 (1)
LER 80-028/03L-0:on 800811,at 100% Power,Control Element Assembly 41 Dropped from 180 to Zero Steps.Caused by Faulty Jumper Cable from Refuel Disconnect Panel to Reactor Head. Power Reduced & Assembly Realigned.Replacement Planned
ML19343A223
Person / Time
Site: Millstone Dominion icon.png
Issue date: 09/08/1980
From: Harris J
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19343A223 (1)
Forwards LERs 80-028/03L-0,80-029/03L-0 & 80-030/03L-0
ML19343A218
Person / Time
Site: Millstone Dominion icon.png
Issue date: 09/08/1980
From: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19343A218 (1)