Forwards IE Insp Repts 50-491/80-10,50-492/80-10 & 50-493/80-10 on 801202-05.No Noncompliance Noted
ML19341D282
Person / Time
Site: Cherokee  Duke Energy icon.png
Issue date: 01/20/1981
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Dail L
DUKE POWER CO.
Shared Package
ML19341D283 List:
References
NUDOCS 8103050281
Download: ML19341D282 (1)


See also: IR 05000491/1980010

Text

,

g ng'o'

- -

[/Q

~ '

,

,8(

k

NUCLEAR REGULATORY COMMISSION

UNITED STATES

s*

{

,E

REGION ll

f

o

101 MARIETTA ST., N.W., SUITE 3100

ATLANTA, GEORGIA 303o3

,

34y 2 01981

?

e

h

d

Duke Power Company

s4

ATTN:

L. C. Dail, Vice President

U(f

F

\\[

i.3 sign Engineering

9-

f{ g *9 d.19 8

P. O. Bcx 33189

--.

y,, %g,g, 7 g gp

Charlotte, NC 28242

,p /

Gentlemen:

M

y

Subject: Report Nos M1/80-1[M/80-10)hd

0-

N

This refers to the routine inspection conducted by J. R. Harris of this office

on December 2-5, 1980, of activities authorized by NRC Construction Permit Nos.

CPPR-167, CPPR-168 and CPPR-169 for the Cherokee Nuclear Station facility, and

to the discussion of our findings held with J. W. Davis at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary

information identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

/

C. E. Murph

.

Reactor Construction and

Engineering Support Branch

cc w/ encl:

J. T. Moore, Project Manager

810305 0 2.M