g ng'o'
- -
[/Q
~ '
,
,8(
k
NUCLEAR REGULATORY COMMISSION
UNITED STATES
s*
{
,E
REGION ll
f
o
101 MARIETTA ST., N.W., SUITE 3100
ATLANTA, GEORGIA 303o3
,
34y 2 01981
?
e
h
d
Duke Power Company
s4
ATTN:
L. C. Dail, Vice President
U(f
F
\\[
i.3 sign Engineering
9-
f{ g *9 d.19 8
P. O. Bcx 33189
--.
y,, %g,g, 7 g gp
Charlotte, NC 28242
,p /
Gentlemen:
M
y
Subject: Report Nos M1/80-1[M/80-10)hd
0-
N
This refers to the routine inspection conducted by J. R. Harris of this office
on December 2-5, 1980, of activities authorized by NRC Construction Permit Nos.
CPPR-167, CPPR-168 and CPPR-169 for the Cherokee Nuclear Station facility, and
to the discussion of our findings held with J. W. Davis at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters. These are discussed in the enclosed inspection report.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary
information identified in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
/
C. E. Murph
.
Reactor Construction and
Engineering Support Branch
cc w/ encl:
J. T. Moore, Project Manager