ML19341C938

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing of Corrective Actions Re IE Insp Rept 50-327/80-36.Withholding Application Approved. W/O IE Insp Rept 50-327/80-36 & Notices of Violation,Apps a & B Encl.Page 8 & App B Withheld (Ref 10CFR2.790)
ML19341C938
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 02/06/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19341C939 List:
References
NUDOCS 8103040570
Download: ML19341C938 (1)


See also: IR 05000327/1980036

Text

I[r.

MAT 3 tat.TE!:St.MTTED HEMiTH

.

CONTA13S 2.700 INFORMATiSN

'

[ f u o,y

UNITED STATES

'

o

NUCLEAR REGULATORY COMMISSION

!

-

n

$

._ $

REGION 11

'#

101 MARIETTA ST., N.W., SUITE 3100

o,

ATLANTA, GEORGIA 30303

%g

o

FEB 0 61981

  • * " *

In Reply Refer To:

RII:EJF

50-327/80-36

Tennessee Valley Authority

ATTN:

H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

. Gentlemen:

Thank you for your letter of October 30, 1980, informing us of steps you have

taken to correct the item of noncompliance concerning activities under NRC

Operating License No. DPR-77 brought to your attention in our October 7,1980.

We will examine your corrective actions and plans during subsequent inspections.

Your application to withhold certain information from public disclosure in

accordance with 10 CFR 2.790 has been accepted.

Information has been deleted

from the inspection report and Appendix A as shown in the enclosures.

Please assure that your copy of Appendix A and the report details show these changes.

Sincerely,

M

R. C. Lewis, Acting Chief

Reactor Operations and Nuclear

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

(Not Exempt)

2.

Appendix B, Notice of Violation

(Exempt from Disclosure)

3.

Inspection Report No. 50-327/80-36, Page 8

(Exempt from Disclosure)

4.

Inspection Report No. 50-327/80-36

(Not Exempt)

cc w/ encl:

G. G. Stack, Project Manager

J. M. Ballentine, Plant

Superintendent

'

.J.

F. Cox, Supervisor, Nuclear

Licensing Section

M. J. Burzynski, Project Engineer

H. N. Culver, Chief, Nuclear Safety

Review Staff

H. J. Green, Division Director

8103040570

Q MArtrztT="riTimmm

C0iiTA!:3 2.73 I:ifC3IAIIfi