Responds to 801218 & 23 Ltrs & 801224 Discussion Re Steam Generator Tube Insp.Corrects Item 4 of Re Operating Conditions.Results of Next Insp Should Be Submitted for Review Prior to Plant Startup
ML19341C118
Person / Time
Site: Point Beach  
Issue date: 02/13/1981
From: Clark R
Office of Nuclear Reactor Regulation
To: Burstein S
WISCONSIN ELECTRIC POWER CO.
References
TAC-43492, NUDOCS 8103020061
Download: ML19341C118 (3)


Text

.

7F24

^

p* '

  • UNITED STATES

! h y, y%

NUCLEAR REGULATORY COMMISSION h

WASHINGTON, D. C. 20555 February 13, 1981

,( m

./ w

.jgit.l: Lid'3\\

4 Docket Nos. 50-266

,,h sj)qd

, 4/

and 50-301 L

q L-w a

4 0 DS A h0 i i u'* 75%

C

/d

  • D C'/

Mr. Sol Burstein Executive Vice President

~

/,s Wisconsin Electric Power Company 231 West Michigan Street Mf7pIS Milwaukee, Wisconsin 53201

Dear Mr. Burstein:

This refers to your letters of December 18 and December 23,1980 and to discussions held with members of your staff on December 24, 1980 r.egarding the recent Point Beach Unit 1 steam generator tube inspection.

As discussed with you on December 24, we completed our review of your inspection results on that date and found them acceptable for continued operation.

Also, based on recent inspection results and operating experience as it stands today, we agree that both your inspection schedule and plans for the next inspection are reasonable subject to the following conditions:

That you conduct a 2000 PSI primary-to-secondary and an 800 PSI A.

secondary-to-primary hydrostatic test as has been done in the past.

That you include support plate flow slots in your next inspection B.

as discussed with you on December 24th.

With respect to your operating conditions identified in your December 18 letter, item 4 (page 3) is not correct. Our Confirmatory Order for Modification of License dated November 30, 1979, portions of which are still in effect, requires, among other things, that you will not resume operation until we determine in writing that eddy current examinations are acceptable in the event of:

primary to secondary leakage in any steam generator in excess A.

of 500 gpd; or any two identified leaking tubes in any 20 calendar da'y period.

B.

Please refer to paragraphs 4,' 5' and 6 of this Order for the specific requirements.

In response to your comments regarding your. sleeving of tubes you are reminded that your Technical Specifications require that any tubes degraded greater than 40% nominal wall thickness are required to be taken out of service by plugging and that to sleeve such tubes, in lieu of plugging would require an amendment to your ifcense.

81030200(p(

f,

i e

9 2-Mr. Sol Burstein

, - We request that you submit the results of your next inspection to us for our review prior to plant start-up as you have done in the past.

- A response to this letter is requested within 30 day; of receipt.

Sincerely.

h b

Robert A. Clark, Chief Operating Reactors Branch #3 Division of Licensing cc: _ See next page e

0 e

e a

f a

m

Mr. Sol Burstein Wisconsin Electric Power Coepary Mr William Guldemand Mr. Bruce Churchill, Esquire USNRC Resident Inspectors Office cc:

Shaw, Pittman, Potts and Trowbridge 6512 Nuclear Road 1800 M Street, N.W.

Two Rivers, Wisconsin 54241 Washington, D. C.

20036 Joseph Mann Library 1516 Sixteenth Street Two' Rivers, Wisconsin 54241 Mr. Glenn 'A. Reed, Manager Nuclear Operations Wisconsin' Electric Power Cocpany Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, Wisconsin 54241 Mr. Gordon Blaha Town Chairman Town of Two Creeks Route 3 Tw: Rivers, Wisconsin 54241 3

Ms. Kathleen M. Falk General Counsel Wisconsin's Environmental Decade 302 E. Washington Avenue Madison, Wisconsin 53703 Di. rector, Criteria an:1 Stan:iards Divisien Cffice of Ra:iis. tion hei;rs=s (AE-460)

~

U.S. Envirc:hental hotectic". Agency Washingten, D.C.

20L60 U. S. Environmental Protection Agency Federal Activities Branch Region V Office ATTN:

EIS COORDINATOR 230 S..Dearborn Street Chicago, Illinois 60604 Chairman.

Public Service Commissien of Wisconsin

~

Hill Farns State Office Building Madison, Wisconsin 53702 G