Forwards IE Insp Repts 50-460/80-13 & 50-513/80-13 on 801020-23 & Notice of Violation
ML19341B289
Person / Time
Site: Washington Public Power Supply System
Issue date: 11/21/1980
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Ferguson R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML19341B284 List:
References
NUDOCS 8101300593
Download: ML19341B289 (2)


See also: IR 05000460/1980013

Text

ilC

'

-

[,, m,

.

pd !"

'o

UNITED STATES

~g

.rq

g

NUCLEAR REGULATORY COMMISSION

$

"

c

nEGION V

'

o,

[

1990 N. CALIFORNI A BOULEVARD

%

,,,a

e

SulTE 202, WALNUT CREEK PLAZA

4

WALNUT CREEK, CALIFCRNIA 94596

'!MI ' -

,q

Docket Nos. 50 460 and 50-513

g

.,y

[

12

'

,

Washington Public Power Sucoly System

hk8/g

C

P. O. Box 968

-,\\.

gg

f

Richland, Washington 99352

4/

(4

Attention:

R. L. Ferguson

b.

Managing Director

Gentlemen:

Subject: fiRC Inspection WNP-1/4 Project

This refers to the inspection conducted by Fessrs. D. F. Kirsch and

P. P. farbut of this office on October 20-23, 1980 of activities authorized

by fiRC Construction Permit lios. CPPR-134 and CPPR-174, and to the discussion

of our findings held with iir. J. P. Thcmas and other members of your staff

at the conclusion of the inspection.

Areas examined during this inspection'are described in the enclosed

inspection report. Within these areas, the inspection consisted of

selective examinaticns of precedures and representative records, in-

terviews with personnel, and observations by the inspector.

Based on the results of this inspection, it appears that certain of your

activities were not conducted in full compliance with fiRC requirements,

as set forth in the l'otice of Violation, enclosed herewith as Appendix A.

These items of noncompliance have been categorized into a level as de-

scribed in the Federal Register on October 7, 1980 (45 FR 66754) as the

Interim Enforcement Policy.

This notice is sent to you pursuant to the provisions of Section 2.201,

of the flRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations.

Pursuant to the provisions of 10 CFR 2.201, Washington

Public Power Supply System is hereby required to submit to this office,

within twenty-five days of the date of this notice, a written statement

or_ explanation in reply including (1) corrective steps which have been

8101300 5 9

_ _ _ _

____-_____.

-

.

Washington Public Power Supply System

-2

ROV 211930

.

taken by you and the results achieved; (2) corrective atops which will

be taken to avoid further violations; and (3) the date when full compliance

will be achieved. Under the authority of Section 182 of the Atomic

Energy Act of 1954, as amended, this response shall be submitted under

oath or effirration.

In accordance with Section 2.790 of the NRC's "Rulfs of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

'

the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you believe

to be proprietary, it is necessrsry that you submit a written application

to this office, within twenty-five days of the date of this letter, requesting

,

that such information be withheld from public disclosure. The application

must include a full statement of the reasons why it is claimed that the

information is procrietary. The application should be prepared so that

!

any proprietary information identified is contained in an enclosure to

the application, since the apolication without the enclosure will also

be placed in the Public Document Room.

If we do not hear from you in

this regard within the specified period, the report will be placed in

the Public Document Room.

Should you have any questions concerning this inspection, we will be

glad to discuss them with you.

'

Sincerely,

.

wn.c_4 5.

G. S. Spencer, Chief

Reactor Construction and

Erlincering Suppo t Branch

Enclosures:

A.

Appendix A - Notice of Violation

B.

IE Inspection Report

Hos. 50-460/80-13

50-513/80-13

cc w/o enclosure:

M. E. Witherspoon, Division Manager

Quality Assurance, WPPSS

D. W. Mazur, Progra;n Director, WPPSS

.