ML19340E817

From kanterella
Jump to navigation Jump to search
Revised Tech Spec Section 3/4.6.2 Re Depressurization & Cooling Sys,Containment Spray Sys
ML19340E817
Person / Time
Site: Calvert Cliffs 
Issue date: 12/18/1980
From:
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19340E753 List:
References
NUDOCS 8101150875
Download: ML19340E817 (1)


Text

l O

CONTAINMENT SYSTEMS 3/4.6.2 DEPRESSURi2ATION AND COOLING SYSTEMS CONTAINMENT SPRAY SYSTEM LIMITING CONDITION FOR OPERATION 3.6.2.1 Two -independent containment spray systems shall be OPERABLE with each spray system capable of taking suction from the RWT on a Containment Spray Actuation Signal and Safety Injection Actuation Signal and automatically transferring suction to the containment sump on a Recirculation Actuation Signal. Each spray system flow path from the containment sump shall be via an OPERABLE shutdown cooling heat exchanger.

APPLICABILITY: MODES 1, 2, and 3*.

ACTION:

With one containment spray system inoperable, restore the inoperable spray system to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY vithin the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.**

l SURVEILLANCE REOUIREMENTS 4.6.2.1 Each containment spray system shall be demonstrated OPERABLE:

a.

At least once per 31 days by:

1.

Verifying that upon a Recirculation Actuation Test Signal, the containment sump isolation valves open and that a recirculation mode flow path via an OPERABLE shutdown cooling heat exchanger is established.

Verifying)that each valve (manual, power operated orin the f 2.

automatic from the RWT on a Containment Pressure-High test signal.

~

i "With pressurizer pressure > 1750 psia.

    • During Cycle 5 operation, the No.1 loop containment spray sub-system is considered operable with total primary stress for DBE conditions less is the allowable hot stress as defined in ASME B&PV than 2.4S, where Sh Codt.SectkonIII,SubsectionNC.-

CALVERT CLIFFS - UNIT 1 3/4 6-10 Amendment No. 49 8101150 } 7 {

l l

l - - - - -

- -