ML19340E736
| ML19340E736 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 10/15/1980 |
| From: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Lundvall A BALTIMORE GAS & ELECTRIC CO. |
| Shared Package | |
| ML19340E734 | List: |
| References | |
| NUDOCS 8101150553 | |
| Download: ML19340E736 (2) | |
See also: IR 05000317/1980013
Text
'
f"
UMTED STAMS
t
NUCLEAR REGULATORY COMMisslON
-
f
- l
o
REGION I
E1
431 PARK AVENUE
KING OF PRUSSI A. PENNSYLV ANI A 19406
Docket Nos. 50-317
0CT 1519W
50-318
Baltimore Gas and Electric Company
ATTN: Mr. A. E. Lundvall . Jr.
Vice President, Supply
P. O. Box 1475
Baltimore, Maryland 21203
Gentlemen:
Subject: Combined Inspection 50-317/80-13; 50-318/80-12
This refers to the routine inspec' tion conducted by Dr. Jin W. Chung of this
office on July 28 - August 1,1980 at Calvert Cliffs Nuclear Power Plant, Units
1 and 2, Lusby, Maryland of activities authorized by NRC License Nos. DPR-53 and
DPR-69 and to the discussions of our findings held by Dr. Chung with Mr. L. B.
Russel and other members of your staff at the conclusion of the inspection, and
to subsequent telephone discussions between Dr. Chung and your Mr. J. T. Carroll
on August 13, 1980: Dr. Chung and your Dr. A. Rafi on August 5, 1980; and, Mr.
N. Blumberg of this office and Mr. R. Sherenko of your staff on August 8.1980.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
Based on the results of this inspection, it appears that certain of your activi-
l
ties were not conducted in full compliance with NRC requirements, as set forth
in the Notice of Violation, enclosed herewith as Appendix A.
These items of
l
noncompliance have been categorized into the levels as described in our corres-
pondence to you dated December 31, 1974.
This notice is sent to you pursuant to
'
the provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title
,
i
10. Code of Federal Regulations.
Section 2.201 requires you to submit to this
I
office, within twenty (20) days of your receipt of this notice, a written state-
(1) corrective steps which have been
ment or explanation in reply including:(2) corrective steps which will be taken
taken by you and the results achieved;
to avoid further items of noncompliance; and (3) the date when full compliance
will be achieved.
,
!
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
'
10. Code of Federal Regulations, a ccpy of this letter and the enclosures will
be placed in the NRC's Public Document Room.
If this report contains any infor-
mation that you (or your contractor) believe to be proprietary, it is necessary
l
1
0101150 q
3
.
.
Baltimore Gas and Electric
Company
2
that you make a written application within 20 days to this office to withhold
such information from public disclosure. Any such application must be accompanied
by an affidavit executed by the owner of the information, which identifies the
document or part sought to be withheld, and which contains a statement of reasons
which addresses with specificity the items which will be considered by the
Commission as listed in subparagraph (b) (4) of Section 2.790. The information
sought to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within the
specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
,
f(
- _=
>
El
n
. Brunner, Chief
Pe tor Operations and Nuclear
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Combined Office of Inspection and Enforcement Inspection
Report Number 50-317/80-13; 50-318/80-12
cc w/ encl:
R. M. Douglass, Manager, Quality Assurance
L. B. Russell, Plant Seperintendent
T. Sydnor, General Supe.avisor, Operations QA
R. C. L. Olson, Principal Engineer
J. Deegan, Assistant General Supervisor, Programs Uni
J. A. Tiernan, Manager, Nuclear Power
R. E. Denton, General Supervisor, Training and Technical Services
-.
-
- . ,
,