Forwards IE Insp Repts 50-317/80-13 & 50-318/80-12 on 800728-0801 & Notice of Violation
ML19340E736
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 10/15/1980
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML19340E734 List:
References
NUDOCS 8101150553
Download: ML19340E736 (2)


See also: IR 05000317/1980013

Text

'

f"

UMTED STAMS

t

NUCLEAR REGULATORY COMMisslON

-

f

  • l

o

REGION I

E1

431 PARK AVENUE

KING OF PRUSSI A. PENNSYLV ANI A 19406

Docket Nos. 50-317

0CT 1519W

50-318

Baltimore Gas and Electric Company

ATTN: Mr. A. E. Lundvall . Jr.

Vice President, Supply

P. O. Box 1475

Baltimore, Maryland 21203

Gentlemen:

Subject: Combined Inspection 50-317/80-13; 50-318/80-12

This refers to the routine inspec' tion conducted by Dr. Jin W. Chung of this

office on July 28 - August 1,1980 at Calvert Cliffs Nuclear Power Plant, Units

1 and 2, Lusby, Maryland of activities authorized by NRC License Nos. DPR-53 and

DPR-69 and to the discussions of our findings held by Dr. Chung with Mr. L. B.

Russel and other members of your staff at the conclusion of the inspection, and

to subsequent telephone discussions between Dr. Chung and your Mr. J. T. Carroll

on August 13, 1980: Dr. Chung and your Dr. A. Rafi on August 5, 1980; and, Mr.

N. Blumberg of this office and Mr. R. Sherenko of your staff on August 8.1980.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Based on the results of this inspection, it appears that certain of your activi-

l

ties were not conducted in full compliance with NRC requirements, as set forth

in the Notice of Violation, enclosed herewith as Appendix A.

These items of

l

noncompliance have been categorized into the levels as described in our corres-

pondence to you dated December 31, 1974.

This notice is sent to you pursuant to

'

the provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title

,

i

10. Code of Federal Regulations.

Section 2.201 requires you to submit to this

I

office, within twenty (20) days of your receipt of this notice, a written state-

(1) corrective steps which have been

ment or explanation in reply including:(2) corrective steps which will be taken

taken by you and the results achieved;

to avoid further items of noncompliance; and (3) the date when full compliance

will be achieved.

,

!

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

'

10. Code of Federal Regulations, a ccpy of this letter and the enclosures will

be placed in the NRC's Public Document Room.

If this report contains any infor-

mation that you (or your contractor) believe to be proprietary, it is necessary

l

1

0101150 q

3

.

.

Baltimore Gas and Electric

Company

2

that you make a written application within 20 days to this office to withhold

such information from public disclosure. Any such application must be accompanied

by an affidavit executed by the owner of the information, which identifies the

document or part sought to be withheld, and which contains a statement of reasons

which addresses with specificity the items which will be considered by the

Commission as listed in subparagraph (b) (4) of Section 2.790. The information

sought to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within the

specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

,

f(

- _=

>

El

n

. Brunner, Chief

Pe tor Operations and Nuclear

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Combined Office of Inspection and Enforcement Inspection

Report Number 50-317/80-13; 50-318/80-12

cc w/ encl:

R. M. Douglass, Manager, Quality Assurance

L. B. Russell, Plant Seperintendent

T. Sydnor, General Supe.avisor, Operations QA

R. C. L. Olson, Principal Engineer

J. Deegan, Assistant General Supervisor, Programs Uni

J. A. Tiernan, Manager, Nuclear Power

R. E. Denton, General Supervisor, Training and Technical Services

-.

-

- . ,

,