ML19340B165

From kanterella
Jump to navigation Jump to search
Forwards Results of Jul 1979-June 1980 Interim Nonradiological Monitoring.No Mods to Study Sampling or Analytical Techniques Implemented from Studies Previously Submitted.No Distinct Changes in Lake Wylie Water Quality
Date released: 12/20/2019 Download: ML19340B165


Interim Monitoring Study,Jul 1979-June 1980.
ML19340B166
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 10/15/1980
From:
DUKE POWER CO.
To:
References
Download: ML19340B166 (26)
Forwards Results of Jul 1979-June 1980 Interim Nonradiological Monitoring.No Mods to Study Sampling or Analytical Techniques Implemented from Studies Previously Submitted.No Distinct Changes in Lake Wylie Water Quality
ML19340B164
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 10/15/1980
From: Parker W
DUKE POWER CO.
To: DENTON H R
Office of Nuclear Reactor Regulation
References
Download: ML19340B164 (1)