UNITEC STATES
NUCLEAR REGULATORY COMMISSION
REGION 111
799 ROOSEVELT ROAD
GLEN ELLYN, ILL!Nols tot 37
_
JAN 141977
Commonwealth Edison Company
Docket No. 50-10
ATTN:
Mr. Byron Lee, Jr.
Docket No. 50-237
Vice President
Docket No. 50-249
P. O. Box 767
Chicago, Illinois 60690
Centlemen:
This refers to the inspection conducted by Messrs. T. H. Essig
and J. W. Hiatt of this office on December 14-17 and 20, 1976, of
-
activities at Dresden Nuclear Power Station, Units 1, 2, and 3
authorized by NRC Operating Licenses No. DPR-2, No. DPR-19, and
No. DPR-25 and to the discussion of our findings with Mr. Stephenson
and members of.his staff at the conclusion of the inspection.
The encloard copy of our inspection report identifies areas
examined daring the inspection. Within these areas, the
inspection consisted of a selective examination of procedures
4
and representative records, observations, and interviews with
~
personnel.
During this inspection, certain of your activities appeared
to be in noncompliance with NRC requirements, as described
under Enforcement Items in the Summary of Findings secticn
of the enclosed inspection report.
This notice is sent to you pursuant to the provisions of
Section 2.201 of the NRC's " Rules'of Practice," Part 2, Title
j
10,- Code of Federal Regulations. Section 2.201 requires you
to submit to this office within twenty days of your receipt
of this notice a written statement or explanation in reply,
,
l
including for each item of noncompliance: (1) corrective
action taken and the results achieved; (2) corrective action
to be taken to avoid further noncompliance; and (3) the date
when full compliance will be achieved.
!
Based on discussions with your representatives at the site', we
understand that you intend to:
(1) retain the Unit 1 Laundry
Tank level charts for a period of one year, rather than the current
retention period of 90 days, and (2) review the January through June
!
1976 report of effluent releases, determine if the five apparent
oM%