Forwards IE Insp Repts 50-010/75-09,50-237/75-14 & 50-249/75-12 on 750428 & 0512.No Noncompliance Noted
ML19340A620
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 05/29/1975
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Brian Lee
COMMONWEALTH EDISON CO.
Shared Package
ML19340A621 List:
References
NUDOCS 8009020571
Download: ML19340A620 (2)


See also: IR 05000010/1975009

Text

.

--

l

' . .

-

.

,

' ' ~ ' '

UNITEo STATES

~

NUCLEAR REGULATORY COMMISSION

' REGloN til

799 ROOSEVELT RO AO

j

.

I

GLEN ELLYN. ILLINOIS 60137

{

hg

7

' D'

MAY 2 9 1975

,

,

Cocnnonwealth Edison Company

Docket No.50-010

ATTN: Mr. Byron Lee, Jr.

Docket No. 50-237

Vice Pres 1 dent

Docket No. 50-249

P. O. Box 767

Chicago, Illinois

60690

Gentlemen:

This refers to the inspection conducted by Mr. T. L. Harpster of this

office on April 28 and May 12, 1975, of activities at Commonwealth

Edison Company's General Offices tnd Dresden Nucicar Power Station

authorized by NRC Licensos No. DPE-2, No. DPR-19, and No. DPR-25, and to

the discussion of our findings with Messrs. Roberts, Butterfield, Hatumn,

and Jurecki at the conclusion of the inspection.

A copy of our report of this inspection is cnclosed and identifies the

-

area mad ned during the inspection. Within this area, the inspection

consisted of a selectivo erminntion of procedures and reprocentative

records, interviews with plant personnel, and observations by the

inspector.

No items of noncompliance with NRC requirenants were identified within

the scope of this inspection. We are forwarding this report to our

headquarters for their review and evaluation.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room. If this report contains any information that you or your contractors

believe to be proprietary, it is necessary that you make a written

application to this office, within twenty days of your receipt of this

letter, to withhold auch information from public disclosure. Any such

application must include a full statement of the reasons for which it is

claimed that the infor=ation is proprietary, and should be prepared so

the proprietary information identified in the application is contained

in a separato part of the document. Unless we receive an application to

withhold information or are otherwise contacted within the specified

time period, the written material identified in this paragraph will be

placed in the Public Document Room.

omo

,yc

<

~

\\

/

800902o5~7l

q

?>>. . s

_

'

D * * lD

" l0

~ O

.e n

1 A X[

&

.

-

-

-

m

.

.

Comunonwealth Edison Company

-2-

No reply to this letter is necessary; however, should you have any

questions concerning this inspection, we will be glad to discuss them

with you.

Sincerely yours,

.

Gaston Fiore111, Chief

,

Reactor Operations Branch

Enclosure:

IE Inspection Reports

,