UNITED STATES
NUCLEAR REGULATORY COMMISSION
[}{3,
REGION 11
- .;
.:. s
o, $
f
101 MARIETTA ST., N.W., sulTE 3100
ATLANTA, G EORGIA 303o3
V
. ' . . . .
In Reply Refer To:
RII:DMM
50-324/80-38
50-325/80-41
Carolina Power and Light Company
ATTN:
J. A. Jones
Senior Executive Vice President and
Chief Operating Officer
411 Fayetteville Street
Raleigh, NC 27602
Gentlemen:
This refers to the inspection conducted by D. M. Montgomery of this office on
October 20-24, 1980, of activ#.cies authorized by NRC Operating License No.
DPR-71 and DPR-62 for the Brunswick facility, and to the discussion of our
findings held with A. C. Tollison at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector. The Region II Mobile Laboratory
was also brought to your site and used by the inspector-to make certain independent
measurements.
The basic purpose of these independent measurements is to verify
your capability for analyzing radioactive effluents, and to achieve and maintain
comparable methods of analyses between your facility and the NRC. The complete
data from t.nese measurements will be reported in a subsequent Inspection Report.
During the inspection, it was found that certain activities under your license
appear to be in no compliance with NRC requirements. These items and references
to pertinent requirerants are listed in the Notice of Violation enclosed herewith
as Appendix A.
This notice is sent to you pursuant to the provisions of Section
2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-
tions.
Section 2.201 requires you to submit to this office, within 20 days of
your receipt of this notice, a written statement or explanation in reply including:
(1) corrective steps which have been taken by you and the results achieved; (2)
corrective steps which will be taken to avoid further noncompliance; and (3) the
date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document. If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
'81021705 %
_
. _-
.
.
.
Carolina Power and Light Company
-2-
DEC 0 51980
Should you have any questions concerning this letter, we will be glad to discuss
'
them with you.
Sincerely,
-
.
-
,
Philip S ohr,
hief
.
Fuel Facility and Materials
Safety Branch
Enclosures:
1.
Appendix A, Notice of Violation
'
2.
Inspection Report No. 50-324/80-38
.
and 50-325/80-41
!
cc w/ encl:
'
A. C. Tollison, Jr., Plant Manager
i
!
i
,
.
9
-*
,
w-,
,y.wn9
--
-vs.
w.
9 - w .y -yw-,
-v-e.,w-,- - , ~
,4-y,.--,--
-,-w,y
9,,7%,-
,,wy,--y-,
y-
9.,-w,p3-.--
,-
y--
p.,,-,
, ,
y-i
g-
y
>wy-a