Proposed Tech Specs 4.7 & 4.8 Re 4.16 Kv Emergency Bus Undervoltage Protection
ML19339C453
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 11/12/1980
From:
PORTLAND GENERAL ELECTRIC CO.
To:
Shared Package
ML19339C444 List:
References
NUDOCS 8011180402
Download: ML19339C453 (6)


Text

..

O INDEX LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS SECTION Page 3/4.7.2 STEAM GENERATOR PRESSURE / TEMPERATURE LIMITATION.......

3/4 7-12 3/4*.7.3 COMPONENT COOLING WATER SYSTEM.......................

3/4 7-13 3/4.7.4 SERVICE WATER SYSTEM.................................

3/4 7-15 3/4.7.5 ULTIMATE HEAT SINK...................................

3/4 7-17 3/4.7.6 CONTROL ROOM EMERGENCY VENTILATION SYSTEM............

3/4 7-18 3/4.7.7 SEALED SOURCE CONTAMINATION..........................

3/7 7-21 3/4.7.8 FIRE SUPPRESSION SYSTEMS Fi re Suppressi on Water System........................ 3/4 7-23 S p r i nk l e r Sy s tems.................................... 3/4 7-27 Fi re Ho s e S ta ti on s................................... 3/4 7-29 3/4.7.9 PENETRATION FIRE BARRIERS............................

3/4 7-31 3/4.7.10 HYDRAULIC SNUBBERS...................................

3/4 7-32 3/4.7.11 CONTROL BUILDING MODIFICATION CONNECTION BOLTS.......

3/4 7-37 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1 A.C. SOURCES 0 p e ra ti n g............................................ 3/4 8-1 Shutdown.............................................

3/4 8-5 3/4.8.2 ONSITE POWER DISTRIBUTION SYSTEMS A.C. Di stribution - Operating........................ 3/4 8-6 A.C. Di stribu tion - Shutdown......................... 3/4 8-7 0.C. Di stribution - Operating........................ 3/4 8-8 D.C. Di stribu ti on - Shutdown......................... 3/4 8-10 3/4.8.3 UNDERVOLTAGE PROTECTION 4.16 kV Emergency Bus Undervoltage Protection........ 3/4 8-11 TROJAN-UNIT 1 yII co\\\\ toit;L

ELECTRICAL POWER SYSTEM f

3/4.8.3 UNDERVOLTAGE PROTECTION 4.16 kV EMERGENCY BUS UNDERVOLTAGE PROTECTION LIMITING CONDITION FOR OPERATION 3.8.3.1 The 4.16 kV Emergency Bus Undervoltage Protection instrumen-tation shown in Table 3.8-1 shall be OPERABLE with their trip set-points set consistent with the values shown in the Trip Setpoint col-umn of Table 3.8-2.

i APPLICABILITY: As shown in Table 3.8-1.

ACTION:

4 With a 4.16 kV Emergency Bus Undervoltage Protection instru-a.

mentation channel trip setpoint exceeding the value shown in Table 3.8-2, declare the channel inoperable and apply the applicable ACTION requirement of Table 3.8-1 until the channel is restored to OPERABLE status with the trip setpoint adjusted consistent with the Trip Setpoint value.

b.

With a 4.16 kV Emergency Bus Undervoltage Protection instrumen-tation channel inoperable, take the ACTION shown in Table 3.8-1.

SURVEILLANCE REQUIREMENTS 4.8.3.1 Each 4.16 kV Emergency Bus Undervoltage Protection instrumen-tation chan el shall be demonstrated OPERABLE by the performance of the CHANNEL CALIBRATION and CHANNEL FUNCTIONAL TEST operations during the modes and at the frequencies shown in Table 4.8-1.

f l '

l TROJAN-UNIT I 3/4 8-11

r

l TABLE 3.8-1 4.16 kV EMERGENCY BUS UNDERVOLTAGE PROTECTION INSTRUMENTATION g

MINIMUM g

TOTAL NO.

CHANNELS CHANNELS APPLICABLE 3

FUNCTIONAL UNIT OF CHANNELS TO TRIP OPERABLE MODES ACTION

?

E a.

4.16 kV Emergency Bus Q

Undervoltage (Loss of

. Voltage) 4/ Bus 2/ Bus 3/ Bus 1, 2, 3*

1 l

b.

~

4.16 kV Emergency Bus Undervoltage (Degraded Voltage) 4/ Bus 2/ Bus 3/ Bus 1, 2.-3*

1 r

i s"

[

T i

C c

1 f

1

l e.

i e

TABLE 3.8-1 (Continued)

TABLE NOTATION

  • Required when ESF equipment is required to be operable.

ACTION STATEMENTS ACTION 1 - With the nt.mber of OPERABLE channels one less than the Total Number of Channels, operation may proceed provided both of the following conditions are satisfied:

j a.

The inoperable channel is placed in the tripped j

condition within one hour.

i b.

The Minimum Channels OPERABLE requirement is met; however, one additional channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing per Specification 4.8.3

}

i-I L

TROJAN-UNIT 1 3/4 8-13 l

i m.

_,.,_,..y.

?

TABLE 3.8-2 4.16 kV EMERGENCY Pi!S UNDERVOLTAGE PROTECTION INSTRUMENTATION TRIP SETPOINTS 51 -

8 FUNCTIONAL UNIT TRIP SETPOINT ALLOWABLE VALUES g

E a.

4.16 kV Emergency Bus 2560 volts with a 2560 1 210 volts with a

-a Undervoltage (Loss of 1.1 second time delay 1.1 1 0.1 second time delay Voltage) b.

4.16 kV Emergency Bus 3850 volts with a 3850 + 80 volts with a Undervoltage (Degraded 55 second time delay 55 i T second time delay Voltage) a f

1

_ _ =.

t t

4 TABLE 4.8-1 4.16 kV EMERGENCY BUS UNDERVOLTAGE PROTECTION INSTRUMENTATION g

SURVEILLANCE REQUIREMENTS o

S CHANNEL MODES IN WHICH f

CHANNEL FUNCTIONAL SURVEILLANCE E

FUNCTIONAL UNIT CALIBRATION TEST REQUIRED a.

4.16 kV Emergency Bus R

M 1,2,3 Undervoltage (Loss of Voltage) b.

4.16 kV Emergency Bus R

M 1,2,3 Undervoltage (Degraded Voltage)

L; 4

9 e

e

.