ML19339C094
| ML19339C094 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 10/10/1980 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parker W DUKE POWER CO. |
| Shared Package | |
| ML19339C091 | List: |
| References | |
| NUDOCS 8011170565 | |
| Download: ML19339C094 (2) | |
See also: IR 05000413/1980026
Text
..
-
.
..
.,.
[
of
UNITED STATES
8"
7
NUCLEAR REGULATORY COMMISSION
$
E
REGION 11
'
- I
101 MARIETTA ST., N.W., SulTE 3100
o
ATLANTA, GEORGIA 30303
o
OCT 101980
- "*
In Reply Refer To:
RII:JJB
50-413/80-26
50-414/80-26
Duke Power Company
ATTN:
W. O. Parker, Jr.
Vice President, Steam Production
P. O. Box 2178
Charlotte, NC 28242
Gentlemen:
This refers to the inspection conducted by J. J.
Blake of this office on
i
September 15 through 19, 1980 of activities authorized by NRC Construction Permit
Nos. CPPR-116 and CPPR-117 for the Catawba facility, and to the discussion of our
findings held with D. L. Freeze at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
j
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
repert will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make. a written application within 20 days to this office to
'
withhold such information from public disclosure. Any such application must
include a full statement'of the reasons on the' basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary infor-
mation identified in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad tg discuss
them with you.
Sincerely,
^
/
a'Y
'C. E. Murph
ief
Reactor Construction and Engineering
Support Branch
,
Enclosure:
i
See Page 2
QN
_
..
.
...
..
.
.
. . .
.
.
.
.
0CT 101980
g
Duke Power Company
-2-
Enclosure:
Inspection Report Nos. 50-413/80-26
and 50-414/80-26
cc w/ encl:
J. W. llampton, Station Manager
D'. G. Beam, Project Manager
.
.
$